Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jun 3, 2026

JMA02P003 262 270 Main Street Development Stormwater Management Report

Preserved file SHA-25672c20944aae1129b177592afa34a50dff15ad477ae008a09c1201da67830e01a

Indexed text · page 103

Show all pages
Page 103

Proposed Flows NOAA10 24-hr D 10-Year-Current Rainfall=5.33" Prepared by HydroCAD SAMPLER 1-800-927-7246 www.hydrocad.net Printed 5/26/2026 HydroCAD® 10.20-8a Sampler s/n S05110 © 2025 HydroCAD Software Solutions LLC This report was prepared with the free HydroCAD SAMPLER, which is licensed for evaluation and educational use ONLY. For actual design or modeling applications you MUST use a full version of HydroCAD which may be purchased at www.hydrocad.net. Full programs also include complete technical support,training materials, and additional features which are essential for actual design work. Time span=0.00-72.00 hrs, dt=0.05 hrs, 1441 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: Proposed Impervious Runoff Area=13,934 sf 100.00% Impervious Runoff Depth=5.09" Tc=1.0 min CN=98 Runoff=1.95 cfs 5,913 cf Subcatchment 3S: Proposed Pervious Runoff Area=907 sf 0.00% Impervious Runoff Depth=2.63" Tc=1.0 min CN=74 Runoff=0.08 cfs 199 cf Subcatchment 4S: Proposed Impervious Runoff Area=15,377 sf 100.00% Impervious Runoff Depth=5.09" Tc=1.0 min CN=98 Runoff=2.15 cfs 6,526 cf Pond 2P: Basin A Peak Elev=97.42' Storage=2,470 cf Inflow=1.95 cfs 5,913 cf Discarded=0.02 cfs 3,179 cf Primary=0.34 cfs 2,735 cf Outflow=0.36 cfs 5,913 cf Pond 5P: Porous Pavement B Peak Elev=97.45' Storage=2,539 cf Inflow=2.22 cfs 6,725 cf Discarded=0.07 cfs 5,536 cf Primary=0.06 cfs 1,189 cf Outflow=0.13 cfs 6,725 cf Total Runoff Area = 30,218 sf Runoff Volume = 12,638 cf Average Runoff Depth = 5.02" 3.00% Pervious = 907 sf 97.00% Impervious = 29,311 sf

File revisions (1)