JMA02P003 262 270 Main Street Development Stormwater Management Report
72c20944aae1129b177592afa34a50dff15ad477ae008a09c1201da67830e01aIndexed text · page 233
Show all pagesPart 1: Description of Nonstructural Approach to Site Design In narrative form, provide an overall description of the nonstructural stormwater management approach and strategies incorporated into the proposed site’s design. Attach additional pages as necessary. Details of each nonstructural strategy are provided in Part 3 below. The existing site consists of mostly impervious area. The total impervious area decreased by approximately 900 square feet and replaced with lawn area and landscaping, which is the only measure that can be practically taken given the site's conditions. New Jersey Stormwater BMP Manual • Appendix A: Low Impact Development Checklist • February 2004 • Page A-3