Supporting Documentation · Jun 3, 2026
JMA02P003 262 270 Main Street Development Stormwater Management Report
72c20944aae1129b177592afa34a50dff15ad477ae008a09c1201da67830e01aIndexed text · page 239
Show all pagesF. Specify percentage of total site impervious cover created by buildings: 47.5% By driveways and parking: 52.5% By roadways: G. What design criteria and/or site changes would be required to reduce the percentages in F above? Reducing the square footage of the building and decreasing the size of the parking lot. H. Specify percentage of total impervious area that will be unconnected: Total site: 0% Buildings: Driveways and parking: Roads: I. Specify percentage of total impervious area that will be porous: Total site: Buildings: Driveways and parking: 19.4% Roads: J. Specify percentage of total building roof area that will be vegetated: 0% K. Specify percentage of total parking area located beneath buildings: 0% L. Specify percentage of total parking located within multi-level parking deck: 0% New Jersey Stormwater BMP Manual • Appendix A: Low Impact Development Checklist • February 2004 • Page A-9
File revisions (1)
- Sep 29, 2026
72c20944aae14,321,443 bytes