Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jun 3, 2026

JMA02P003 262 270 Main Street Development Stormwater Management Report

Preserved file SHA-25672c20944aae1129b177592afa34a50dff15ad477ae008a09c1201da67830e01a

Indexed text · page 243

Show all pages
Page 243

Part 4: Compliance with Nonstructural Requirements of NJDEP Stormwater Management Rules 1. Based upon the checklist responses above, indicate which nonstructural strategies have been incorporated into the proposed development’s design in accordance with N.J.A.C. 7:8-5.3(b): No. Nonstructural Strategy Yes No 1. Protect areas that provide water quality benefits or areas particularly susceptible to erosion and sediment loss. X 2. Minimize impervious surfaces and break up or disconnect the flow of runoff over impervious surfaces. X 3. Maximize the protection of natural drainage features and vegetation. X 4. Minimize the decrease in the pre-construction time of concentration. X 5. Minimize land disturbance including clearing and grading. X 6. Minimize soil compaction. X 7. Provide low maintenance landscaping that encourages retention and planting X of native vegetation and minimizes the use of lawns, fertilizers, and pesticides. 8. Provide vegetated open-channel conveyance systems discharge into and X through stable vegetated areas. 9. Provide preventative source controls. X 2. For those strategies that have not been incorporated into the proposed development’s design, provide engineering, environmental, and/or safety reasons. Attached additional pages as necessary. There is no natural vegetation onsite. It is not possible to protect vegetation that is not present. There were also no areas on site where it was feasible to have vegetated open-channel systems. New Jersey Stormwater BMP Manual • Appendix A: Low Impact Development Checklist • February 2004 • Page A-13

File revisions (1)