Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jun 3, 2026

JMA02P003 262 270 Main Street Development Stormwater Management Report

Preserved file SHA-25672c20944aae1129b177592afa34a50dff15ad477ae008a09c1201da67830e01a

Indexed text · page 33

Show all pages
Page 33

Existing Flows NOAA10 24-hr D 2-Year-Current Rainfall=3.43" Prepared by HydroCAD SAMPLER 1-800-927-7246 www.hydrocad.net Printed 5/26/2026 HydroCAD® 10.20-8a Sampler s/n S05110 © 2025 HydroCAD Software Solutions LLC This report was prepared with the free HydroCAD SAMPLER, which is licensed for evaluation and educational use ONLY. For actual design or modeling applications you MUST use a full version of HydroCAD which may be purchased at www.hydrocad.net. Full programs also include complete technical support,training materials, and additional features which are essential for actual design work. Subcatchment 1S: Existing Impervious Hydrograph Runoff 2.67 cfs NOAA10 24-hr D 2-Year-Current Rainfall=3.43" Runoff Area=29,916 sf 2 Runoff Volume=7,969 cf Runoff Depth=3.20" Flow (cfs) Flow Length=166' Tc=0.9 min CN=98 1 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours)

File revisions (1)