Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jun 3, 2026

JMA02P003 262 270 Main Street Development Stormwater Management Report

Preserved file SHA-25672c20944aae1129b177592afa34a50dff15ad477ae008a09c1201da67830e01a

Indexed text · page 45

Show all pages
Page 45

Existing Flows NOAA10 24-hr D 10-Year-Current Rainfall=5.33" Prepared by HydroCAD SAMPLER 1-800-927-7246 www.hydrocad.net Printed 5/26/2026 HydroCAD® 10.20-8a Sampler s/n S05110 © 2025 HydroCAD Software Solutions LLC This report was prepared with the free HydroCAD SAMPLER, which is licensed for evaluation and educational use ONLY. For actual design or modeling applications you MUST use a full version of HydroCAD which may be purchased at www.hydrocad.net. Full programs also include complete technical support,training materials, and additional features which are essential for actual design work. Summary for Link 3L: Total Site Flows Inflow Area = 30,218 sf, 99.00% Impervious, Inflow Depth = 5.07" for 10-Year-Current event Inflow = 4.20 cfs @ 12.06 hrs, Volume= 12,762 cf Primary = 4.20 cfs @ 12.06 hrs, Volume= 12,762 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Link 3L: Total Site Flows Hydrograph Inflow 4.20 cfs Primary 4.20 cfs Inflow Area=30,218 sf 4 3 Flow (cfs) 2 1 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours)

File revisions (1)