Supporting Documentation · Jun 3, 2026
JMA02P003 262 270 Main Street Development Stormwater Management Report
72c20944aae1129b177592afa34a50dff15ad477ae008a09c1201da67830e01aIndexed text · page 85
Show all pagesProposed Flows NOAA10 24-hr D 2-Year-Current Rainfall=3.43" Prepared by HydroCAD SAMPLER 1-800-927-7246 www.hydrocad.net Printed 5/26/2026 HydroCAD® 10.20-8a Sampler s/n S05110 © 2025 HydroCAD Software Solutions LLC This report was prepared with the free HydroCAD SAMPLER, which is licensed for evaluation and educational use ONLY. For actual design or modeling applications you MUST use a full version of HydroCAD which may be purchased at www.hydrocad.net. Full programs also include complete technical support,training materials, and additional features which are essential for actual design work. Time span=0.00-72.00 hrs, dt=0.05 hrs, 1441 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: Proposed Impervious Runoff Area=13,934 sf 100.00% Impervious Runoff Depth=3.20" Tc=1.0 min CN=98 Runoff=1.24 cfs 3,712 cf Subcatchment 3S: Proposed Pervious Runoff Area=907 sf 0.00% Impervious Runoff Depth=1.19" Tc=1.0 min CN=74 Runoff=0.03 cfs 90 cf Subcatchment 4S: Proposed Impervious Runoff Area=15,377 sf 100.00% Impervious Runoff Depth=3.20" Tc=1.0 min CN=98 Runoff=1.37 cfs 4,096 cf Pond 2P: Basin A Peak Elev=96.83' Storage=1,526 cf Inflow=1.24 cfs 3,712 cf Discarded=0.02 cfs 2,932 cf Primary=0.06 cfs 779 cf Outflow=0.08 cfs 3,712 cf Pond 5P: Porous Pavement B Peak Elev=97.26' Storage=1,489 cf Inflow=1.41 cfs 4,186 cf Discarded=0.07 cfs 4,115 cf Primary=0.01 cfs 71 cf Outflow=0.07 cfs 4,186 cf Total Runoff Area = 30,218 sf Runoff Volume = 7,898 cf Average Runoff Depth = 3.14" 3.00% Pervious = 907 sf 97.00% Impervious = 29,311 sf
File revisions (1)
- Sep 29, 2026
72c20944aae14,321,443 bytes