Supporting Documentation · Jun 3, 2026
Siad topographical survey from Schmidt5282026
ae89c9c7a7b505c8597b51579cbebc19ebebdfaa6fb3c2a0f62d68e43c7dd485Indexed text
(1/4" NYLON ROPE, THICKNESS SHOWN IS FOR STONE CONSTRUCTION ENTRANCE ONLY (TYP.). 2" FLAT WASHERS) LENGTH OF STONE REQUIRED INSTALLATION DETAIL BAG DETAIL PERCENT SLOPE OF ROADWAY COARSE GRAINED SOILS FINE GRAINED SOILS TOWNSHIP COMMENTS
TOWNSHIP COMMENTS DUMP 0 TO 2% 50 FT. 100 FT. STRAP NOTES ON STORM SEWER INLET PROTECTION: 2 TO 5% 100 FT. 200 FT. REVISION ENTIRE SURFACE STABILIZED WITH HOT MIX ASPHALT ----
---- ---- ---- ---- ---- ----
---- ---- ---- ---- ----
---- ---- 1. MUST SLOW THE STORM WATER TO PROVIDE THE COARSE >5% BASE COURSE, MIX I-2 1 1" REBAR SEDIMENT PARTICLES A CHANCE TO SETTLE, AND PROVIDE FOR BAG AN AREA TO RETAIN THE PARTICLES THAT HAVE SETTLED. 1. AS
FOR BAG AN AREA TO RETAIN THE PARTICLES THAT HAVE SETTLED. 1. AS PRESCRIBED BY LOCAL ORDINANCE OR OTHER GOVERNING AUTHORITY. REMOVAL DUMP FROM STRAP 2. IN ALL CASES, INLET PROTECTION SHOULD NOT INLET COMPLETELY CLOSE OFF THE INLET. D5 DETAIL: STABILIZED CONSTRUCTION ENTRANCE R 3. THE PROTECTION DEVICE WILL BE DESIGNED TO CAPTURE C1.10 SCALE: NTS No.
No. OR FILTER RUNOFF FROM THE 1 YEAR, 24 HOUR STORM ---- ---- ---- ----
---- ---- ---- ----
---- ---- ---- ---- 01
01 SILTSACK AS MANUFACTURED EVENT AND SHALL SAFELY CONVEY HIGHER FLOWS BY ACF DIRECTLY INTO THE STORM SEWER SYSTEM. · OTHER METHODS THAT ACCOMPLISH THE PURPOSE OF ANCHOR PINS NO. 5 STEEL BARS CONTROL NOTES AND DETAILS
File revisions (1)
- Sep 29, 2026
ae89c9c7a7b551,124,221 bytes