Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jun 24, 2026

2025 01

Preserved file SHA-2563e153c6ef42e69a7c474c1d6d320906754879a53d194af56e4bfa0a831c187c6

Indexed text

Page 1

FROM PROPERTY LINE 25-8.1 5 FT. NO CHANGE NONCONFORMING (PARKING) AERIAL MAP SUPPLEMENTAL PROVISIONS SCALE: 1" = 250' TAX MAP SCALE: 1" = 250' MAXIMUM FENCE HEIGHT AERIAL MAP OBTAINED FROM NJGIN IMAGERY WAREHOUSE, 2020. (SIDE & REAR YARD) 25-8.4 (c) 6 FT. 6 FT. NO CHANGE YES TAX MAP INFORMATION OBTAINED FROM THE TOWNSHIP OF WEST ORANGE TAX MAP SHEET NUMBERS 74, 75, 77, & 78 ZONING INFORMATION OBTAINED FROM TOWNSHIP OF WEST ORANGE ZONING MAP BUFFER TO RESIDENTIAL

Page 1

BUFFER TO RESIDENTIAL VARIES EXISTING DISTRICT 25-11.3 (a) 50 FT. NO CHANGE NONCONFORMING 0 FT. TO 60 FT. LIST OF DRAWINGS PARKING REQUIREMENTS SHEET NO. NAME PREPARED BY CHECKED BY: JMP MIN. NUMBER OF TREES 1 TREE/ 10 SP. SP-1 TITLE

Page 1

MIN. NUMBER OF TREES 1 TREE/ 10 SP. SP-1 TITLE SHEET PETRY ENGINEERING 25-12.1 (o) 1 TREE/ 10 SP. 1 TREE/ 10 SP. YES DRAFTED BY: JAF WITHIN PARKING AREA (47 TREES) SP-2 EXISTING CONDITIONS PLAN PETRY ENGINEERING 9'x18' STD. 9'x18' STD. 9'x18' STD. SP-3 OVERALL LAYOUT PLAN PETRY ENGINEERING PARKING STALL SIZE 25-12.1 (p) YES 8'x15' COMPACT 8'x15' COMPACT 8'x15' COMPACT SP-4.1 DEMOLITION PLAN - PHASE 1 PETRY ENGINEERING

Page 1

347 ON-SITE 362 ON-SITE MIN. REQUIRED PARKING SP-4.2 DEMOLITION PLAN - PHASE 2 PETRY ENGINEERING 435 SPACES 124 EASEMENT 124 EASEMENT YES (PER PB 96-08 RESOLUTION) SP-5.1 DETAILED LAYOUT PLAN - PHASE 1 PETRY ENGINEERING (471 TOTAL) (486 TOTAL) SP-5.2 COMMUNITY GARDEN LAYOUT PLAN PETRY ENGINEERING 24 FT. TWO WAY 24 FT. 24 FT.

Page 1

24 FT. TWO WAY 24 FT. 24 FT. MIN. 2 WAY DRIVEWAY WIDTH 25-12.1 (h) YES SP-5.3 DETAILED LAYOUT PLAN - PHASE 2 PETRY ENGINEERING 14 FT. ONE WAY 15 FT. 15 FT. SP-6.1 GRADING & DRAINAGE PLAN - PHASE 1 PETRY ENGINEERING ENGINEERING , LLC PROPOSED PARKING SPACES: ELECTRIC VEHICLE PARKING REQUIREMENT: (2) SP-6.2 GRADING & DRAINAGE PLAN - PHASE 2 PETRY ENGINEERING 4% OF TOTAL PARKING SP-6.3 UTILITY PLAN AND ADDITIONAL SIDEWALK GRADING PLAN PETRY ENGINEERING

Page 1

SP-6.3 UTILITY PLAN AND ADDITIONAL SIDEWALK GRADING PLAN PETRY ENGINEERING LOT A (EMPLOYEE LOT): 81 SPACES AND 5% OF EV MUST BE ADA ACCESSIBLE SP-7.1 COURTYARD LAYOUT, GRADING & DRAINAGE PLAN PETRY ENGINEERING LOT B (VALET LOT): 117 SPACES SP-8.1 DRIVEWAY PROFILE PETRY ENGINEERING LOT C (PUBLIC PARKING): 152 SPACES =269 x 0.04 = 11 EV SPACES REQUIRED SP-8.2 STORM SEWER NETWORKS PETRY ENGINEERING LOT D (CROSS-ACCESS EASEMENT): 124 SPACES EV CREDIT : 12 SPACES SP-8.3 STORM SEWER NETWORKS PETRY ENGINEERING 12 EV SPACES (2 ADA) PROPOSED

Page 1

12 EV SPACES (2 ADA) PROPOSED SP-9.1 LIGHTING PLAN - PHASE 1 PETRY ENGINEERING TOTAL: 486 SPACES (2) SP-9.2 LIGHTING PLAN - PHASE 2 PETRY ENGINEERING ADA PARKING CALCULATION: SP-9.3 LIGHTING DETAILS PETRY ENGINEERING 269 SPACES PROPOSED SP-10.1 SOIL EROSION AND SEDIMENT CONTROL PLAN - PHASE 1 PETRY ENGINEERING

Page 1

SOIL EROSION AND SEDIMENT CONTROL PLAN - PHASE 1 PETRY ENGINEERING MAX. OCCUPANCY CALCULATION: ADA REQUIRED FOR OVER 201-300 SPACES: SP-10.1A SOIL EROSION AND SEDIMENT CONTROL PLAN - PHASE 1 PETRY ENGINEERING PREVIOUSLY APPROVED OCCUPANCY (PER PB 25-02 RESOLUTION) 7 ADA SPACES (2 ACCESSIBLE VAN SPACE) REQUIRED SP-10.2 SOIL EROSION AND SEDIMENT CONTROL PLAN - PHASE 2 PETRY ENGINEERING 1515 PERSON OCCUPANCY WITH 465 PARKING SPACES SP-10.3 SESC DETAILS PETRY ENGINEERING 8 ADA SPACES (2 ACCESSIBLE VAN SPACE) PROPOSED SP-11.1 GENERAL NOTES PETRY ENGINEERING PROPOSED PARKING SPACES = 486 SPACES SP-11.2 CONSTRUCTION DETAILS PETRY ENGINEERING J. MICHAEL PETRY-PE,PP,RA

Page 1

EERING J. MICHAEL PETRY-PE,PP,RA SP-11.3 CONSTRUCTION DETAILS PETRY ENGINEERING NJ PROFESSIONAL ENGINEER LIC. No. 36662 NEW MAX. OCCUPANCY = (1515 PERSONS) * 486 SPACES SP-11.4 CONSTRUCTION DETAILS PETRY ENGINEERING DATE: 01/31/2025 471 SPACES) TM-1 TURNING MOVEMENTS PETRY ENGINEERING = 1563 PERSON MAX. OCCUPANCY TR-1 TREE REMOVAL PLAN PETRY ENGINEERING

Page 1

TR-2 TREE REPLACEMENT PLAN PETRY ENGINEERING (1) BUILDING COVERAGE INCLUDES PORTE COCHERE TR-3 TREE REMOVAL PLAN - PHASE 2 PETRY ENGINEERING (2) ADA AND EV PARKING REQUIREMENTS ARE CALCULATED FOR LOT B AND LOT C. TR-4 TREE REPLACEMENT PLAN - PHASE 2 PETRY ENGINEERING SS-1 EXISTING STEEP SLOPES MAP PETRY ENGINEERING 1 OF 1 BOUNDARY SURVEY ZL LAND SURVEYING LLC PREPARED

File revisions (1)