Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jun 3, 2026

JMA02P003 262 270 Main Street Development Stormwater Management Report

Preserved file SHA-25672c20944aae1129b177592afa34a50dff15ad477ae008a09c1201da67830e01a

Indexed text · page 67

Show all pages
Page 67

Existing Flows NOAA10 24-hr D 10-Year-Future Rainfall=6.31" Prepared by HydroCAD SAMPLER 1-800-927-7246 www.hydrocad.net Printed 5/26/2026 HydroCAD® 10.20-8a Sampler s/n S05110 © 2025 HydroCAD Software Solutions LLC This report was prepared with the free HydroCAD SAMPLER, which is licensed for evaluation and educational use ONLY. For actual design or modeling applications you MUST use a full version of HydroCAD which may be purchased at www.hydrocad.net. Full programs also include complete technical support,training materials, and additional features which are essential for actual design work. Summary for Subcatchment 2S: Existing Pervious Runoff = 0.03 cfs @ 12.07 hrs, Volume= 87 cf, Depth= 3.45" Routed to Link 3L : Total Site Flows Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs NOAA10 24-hr D 10-Year-Future Rainfall=6.31" Area (sf) CN Description 302 74 >75% Grass cover, Good, HSG C 302 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 1.0 Direct Entry, Subcatchment 2S: Existing Pervious Hydrograph Runoff 0.036 0.03 cfs 0.034 NOAA10 24-hr D 0.032 0.03 10-Year-Future Rainfall=6.31" 0.028 Runoff Area=302 sf 0.026 Runoff Volume=87 cf 0.024 0.022 Runoff

Page 67

Runoff Volume=87 cf 0.024 0.022 Runoff Depth=3.45" Flow (cfs) 0.02 Tc=1.0 min 0.018 CN=74 0.016 0.014 0.012 0.01 0.008 0.006 0.004 0.002 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours)

File revisions (1)