Supporting Documentation · Jun 24, 2026
05292026_PB 2026 04 111 Prospect Ave_Completeness Review 2
1d77216c4a4dd6ea6435902932a41990d70cae4e75697d4b3f610d0ea9794608Indexed text · page 2
Show all pagesMemorandum Page 2 of 7 o Township of West Orange Tree Removal and Replacement Permit Application for 111 Prospect Avenue, prepared dated March 14, 2026 o Corporate Ownership Disclosure for Orange Prospect LLC, undated. o Township of West Orange Planning Board Resolution for Application PB 25-02, memorialized on June 4, 2025. o Township of West Orange Planning Board Resolution for Application PB-92-10, dated December 1, 1993. o Township of West Orange Planning Board Resolution for Application PB-96-08, dated October 9, 1996. o Township of West Orange Planning Board Resolution for Application PB-97-21, dated October 8, 1997. o Township of West Orange Board of Adjustment Resolution for ZB-98-07 Use Variance, dated May 14, 1998. • Eleven (11) pages of Environmental Impact Statement for The Estate at 111 Prospect Avenue, prepared by Petry Engineering, LLC, dated February 27, 2026. • Thirty-two (32) sheets of Amended Preliminary and Final Site Plan for The Estate at 111 Prospect Avenue, prepared by J. Michael Petry, PE, PP, RA, dated December 19, 2025. • Eight (8) sheets of Restaurant Building Architectural Plans prepared by J. Michael Petry, PE, PP, RA, dated December 19, 2025. • Three (3) sheets of Main Building Architectural Plans prepared by J. Michael Petry, PE, PP, RA, dated December 19, 2025. • One (1) sheet of Boundary and Topographic Map of Bow and Arrow Manor, Inc on Lots 15.03 & 17.01 of Block 151 and Lots 5 & 6 of Block 151.02, prepared by Petry Engineering, LLC., dated February 29, 2012. • Two-hundred and three (203) pages of Stormwater Management Report for The Estate at Block 151, Lot 17.01, prepared by Petry Engineering, LLC, dated December 19, 2025. • Two (2) pages of Soil Moving Permit Request for The Estate, prepared by Petry Engineering, LLC, undated. 2. Proposed Application This application initially received major site plan and bulk variance approval and was adopted on June 4, 2025 by Planning Board Resolution 25-02. The Applicant is seeking amended preliminary and final site plan approval along with soil removal permit, stormwater permit, tree removal and replacement permit, and extension of time to install replacement trees. The extent of this amended application includes amended
File revisions (1)
- Sep 29, 2026
1d77216c4a4d294,865 bytes