Supporting Documentation · Jun 24, 2026
05292026_PB 2026 04 111 Prospect Ave_Completeness Review 2
1d77216c4a4dd6ea6435902932a41990d70cae4e75697d4b3f610d0ea9794608Indexed text · page 6
Show all pagesMemorandum Page 6 of 7 Applicant stated that a Solid Waste Management Plan was submitted as part of the previous application, and an update can be provided if necessary. e. All off-site and on-site easements which may be required together with copies of legal documentation to support the grant of such easements. Easements noted on Site Plan and copies of existing recorded easements are included in Exhibit F of application. X f. The location and type of all other underground utilities. X Major Site Plan Requirements - Final Stage § 25-51.7.2 a. Verification that all of the conditions of the preliminary approval have been met. N/A b. A map or maps which comply with this chapter depicting that portion of the project for which final approval is being requested. X c. A developer's agreement if required by the preliminary approval. X d. A statement indicating the reasons for any deviations from approved preliminary site plan. X e. Any off-tract improvement contributions if required. X f. Four copies of a map, referred to as a "Run Card", depicting the location of all fire hydrants within the subject property, and depicting the surrounding streets, based on a scale of one inch equaling 400 feet, and contained on an 8 1/2 inch by eleven-inch paper within an area not to exceed 7 1/2 inches in width and eight inches in height. Applicant to provide or request a waiver. X “C” Variance Requirements - § 25-51.9 a. A map, either in conformance with subsections 25- 51.3, 25-51.4, 25-51.5, 25-51.6 and 25-51.7.1 or if the application is to be bifurcated, a separate map, signed and sealed by an architect, engineer, planner or surveyor which provides sufficient data (i.e., setbacks, lot area, existing and proposed structures, etc.) upon which a decision can be based. X b. A statement or legal brief which clarifies why the "c" variance should be granted. Particular attention should be paid to the contents of N.J.S.A. 40:55D-70c, applicable case law and relevant Township Ordinances and N.J. Statutes. X Waiver Requests When requested in writing, the Board shall have the power to grant waivers from the submission of requirements of the completeness checklist. Your waiver requests may be granted if the Board finds that your request is reasonable, and that an informed decision can be rendered without the information. If the Board denies any waiver request, the application will be
ay be granted if the Board finds that your request is reasonable, and that an informed decision can be rendered without the information. If the Board denies any waiver request, the application will be incomplete and the Board does not have to make a decision on the application until such time as the required information is provided.
File revisions (1)
- Sep 29, 2026
1d77216c4a4d294,865 bytes