Supporting Documentation · Jun 18, 2026
1240815MAINTENANCE MANUAL rcd 3 12 2026
5e7c082467254b9c9d93fe2e726180795643cfd61f8a37d2fb2ffc36f67d1839Indexed text · page 7
Show all pagesPart I- Maintenance Plan A. List of Stormwater Management Measures The stormwater management measures incorporated into this development are listed below. The corresponding Field Manuals for the stormwater management measures are located in Part II of the Maintenance Plan. Type of Stormwater State Plane Management BMP No. Location Description Coordinates / Measure Lat., Long. Southwest corner of Porous Pavers 40°48'30.47" 1 the development, at System 74°15'38.26" the rear of the site. Southeast corner of Underground Pipe 40°48'29.89" 2 the development, at System 74°15'38.28" the rear of the site. B. LOCATION MAP (AT END OF REPORT) C. LOCAL AGENCIES The following agencies are listed for the owner/operator’s reference: Hudson, Essex & Passaic Soil Conservation District 15 Bloomfield Ave. North Caldwell, New Jersey 07006 Tel.—(973) 364-0786 Essex County Engineering Department 900 Bloomfield Ave. Verona, New Jersey 07044 Tel.—(973) 226-8506 Fax.—(973) 226-7469 Township of West Orange Engineering Department 25 Lakeside Avenue West Orange, New Jersey 07052 Tel.—(973) 325-4160 New Jersey Department of Environmental Protection Division of Land Use Regulation P.O. Box 420—501 East State Street Station Plaza 5—Second Floor Trenton, New Jersey 08625 Tel—609-777-0454 Website— www.nj.gov/dep/landuse 1
File revisions (1)
- Sep 29, 2026
5e7c08246725874,135 bytes