Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jun 18, 2026

1240815 EIS Pleasant Valley Wayrcd 3 12 2026

Preserved file SHA-256cf49aef11dd73114389cc6d73230975af88d4f9ab779d6a10c7ef2c539ecbc73

Indexed text · page 6

Show all pages
Page 6

5 dwelling unit. The proposed project includes 3,300 sq. ft. of new office space and 2 new apartments; the anticipated flow is: Office: 3,300 sq. ft. x 0.10 gpd = 330 gpd Apartments: 2 x 225 gpd = 450 gpd Total = 780 gpd The existing sanitary sewer along Pleasant Valley Way is an 8-inch diameter pipe and flows from south to north. The slope of the sanitary sewer system produces a flow capacity of 00.0 GPD flowing “half full” the addition of 780 gpd would have a minimal impact on the sanitary sewer system. The local sewers discharge into interceptor sewers and eventually into the treatment plant owned and operated by the Joint Meeting Sewer Commission of Essex and Union counties. There are no sewer bans or moratoriums restricting connections into the sewer system currently.

File revisions (1)