Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jun 18, 2026

1240815 EIS Pleasant Valley Wayrcd 3 12 2026

Preserved file SHA-256cf49aef11dd73114389cc6d73230975af88d4f9ab779d6a10c7ef2c539ecbc73

Indexed text · page 7

Show all pages
Page 7

6 V. MITIGATION 5.1 INTRODUCTION Previously, evaluations of the existing site conditions and the unavoidable impacts associated with the construction of the proposed addition were presented and discussed. This section examines other measures that can be used to minimize potential adverse environmental effects. Only items which require further explanation or description are discussed. 5.2 VEGETATION Given the fact that there is little existing vegetation on-site the project proposal will substantially improve the site’s environment. A planting plan has been prepared by a landscape architect. This plan includes a variety of shrubs, ground cover, flowering trees, flower beds, and evergreens in various locations. This would help provide a buffer for the adjoining properties as well as enhancing the site esthetics. 5.3 HYDROLOGY AND STORM WATER RUNOFF The development of this parcel as described above would not change the existing drainage patterns and will improve not only the rate of runoff but volume and quality as well. The grading and underground stormwater storage system are designed so as to direct nearly all of the stormwater runoff from the developed part of the site to the southeastern corner of the site. Projected runoff and volume for the two, ten, and hundred year storms would be reduced in accordance with the stormwater management requirements. In addition to reducing flow rates, the proposed system would enhance stream quality by capturing sediments and other deleterious materials. A complete discussion of the proposed drainage, and treatment, along with supporting calculations is found in the Stormwater Management Report 512-516 Pleasant Valley Way

File revisions (1)