Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jun 10, 2026

PB 24 01 West Essex Highlands Inc Draft Resolution

Preserved file SHA-25688b1e06eba76e8559e692edab6f02f60980b69d5ca4562d3790275a18467f503

Indexed text · page 2

Show all pages
Page 2

WHEREAS, the Applicant provided testimony from Mark Hoffman, Partner with Garden Homes and principally responsible for the design, development and construction of the West Essex Highlands, Inc. project, Paul Anderson, PE. of Anderson Consulting Services, LLC, as a professional engineer, and Laurance D. Appel, R.A., of Appel Design Group, P.A., as a professional architect, Karl A. Pehnke, P.E. of Langan Engineering and Environmental Services, LLC, as a traffic engineering expert, Mark Seel, P.E. of Langan Engineering as a geotechnical engineering expert, and John McDonough, LA,PP as a professional planner, and WHEREAS, the Applicant submitted the following documents to the Board in the form of the application package and additional supplemental revised reports: ITEM SIGNED BY DATE/REVISION Preliminary and Final Site Plan Drawings (60 sheets) Paul W. Anderson P.E. of Anderson Consulting Services. 6/24/2024 Stormwater Management Report Paul W. Anderson, P.E. of Anderson Consulting Services 6/24/2024 revised 10/28/2024 Traffic Impact Study Karl A. Pehnke, P.E. and Eric J. Viloria, P.E. 6/19/2024 Comments Letter to CME review memorandum Paul W. Anderson, P.E. 6/27/2024 Topographic Survey of Tax Lot 32, Block 179 (1 sheet) Jeffrey S. Grunn, PLS, Lakeland Surveying 9/6/2023 Architectural Plans (24 sheets) Laurence D. Appel, R.A. of Appel Design Group 5/13/2024 Settlement Litigation Agreement between West Essex Highlands, Inc. and the Township of West Orange 4/23/2020 Drainage Report Paul Anderson, P.E of Anderson Consulting Services 10/30/2023 Planning Board Resolution 4/5/2006

File revisions (1)