Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Aug 20, 2026

26 4 17 Perez 66 Whittlesey West Orange Response letter from project engineer re revisions to the plansrcd 6

Preserved file SHA-2569cc27ea80413ec84a3f61c9dad63e90b4fa6df01004cd17a85704f5c54fad08e

Indexed text

Page 1

A EKA ASSOCIATES, PA. 328 Park Avenue Phone: 908.322.2030 Scotch Plains, NJ 07076 Fax: 908.322.0505 www. ekaassociates.com April 17, 2026 West Orange Township Site Plan Review Advisory Board (SPRAB) Geniece Gary — Adams, Director Planning & Development/Zoning Official 66 Main Street, Room 217 West Orange, NJ 07052 Re: — Juan & Zenobia Perez — Use Variance 66 Whittlesey Avenue Lot 60, Block 129 Zone: R-T Residential EKA Job No. 850323 Dear Chairwoman & Members of the Board: The following addresses the review comments made by SPRAB Letter, dated March 16, 2026. General Comments: 1. No response required. 2. No response required since the Planning Report will address the d-6 height variance. 3. A Landscaping Plan has been provided and coordinated with the existing site landscaping. 4, The proposed front steps have been rearranged to provide adequate steps (at 8” each) to meet the existing sidewalk as shown on the revised Grading Plan. 5. The existing wall and fence along the frontage of the property is proposed to be removed and replaced with a proposed fence and gate (opening towards the house) along the existing sidewalk on Whittlesey Avenue. 6. The Schedule of General Requirements Table revised to show the accurate Existing and Proposed Building height. 7. Safe Turning movements in the rear of the property are provided. Thank you for your time and attention on this matter. If you have any questions regarding any of the above, please feel free to call me at my office. Principal Engineer SA\EKA Word Documents\850000\850323 Perez\CORRESPONDENCE\Municipality\850323- Response Letter (Rev 2026-4-17).docx Engineering ¢ Surveying * Planning

File revisions (1)