Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Aug 20, 2026

26 06 18 66 Whittlesey Planning Review 2

Preserved file SHA-256ccba76735d6047d8f223d87e0dff824e45793766afb6709a33bf0e5958b94ba1

Indexed text · page 4

Show all pages
Page 4

NJ Certificate of Authorization No. 24GA28412500 East Brunswick • Barnegat • Berlin • Camden • Cape May Court House • Neptune • New York Page 4 of 8 4. Variances & Waivers Required It appears that the following conditions will require variance or design waiver relief from the Board to permit the project as proposed: Variances: a. §25-7.1 Attachment 2 – Three-family or multi-family dwellings are not permitted in the R-T district. A d-1 use variance is required. b. §25-7.1 Maximum Building Height – The maximum building height is 2.5 stories / 35 feet where, and 3 stories +/- 42 feet is proposed. As this height increase is greater than 10% of the maximum permitted, this requires a d-6 height variance. c. §25-7.1 Front Yard – The minimum required front yard setback is 30 feet, where 9.35 currently exists, and 9.29 feet is proposed. d. §25-7.1 Maximum Lot Coverage – The maximum lot coverage permitted is 55% of the total lot area, where 62.8% has existed, and 74.34% proposed. e. §25-12.2(a) Parking Spaces – The minimum number of parking spaces required is 7 parking spaces, where 4 are proposed. 5. Master Plan Considerations The Township’s Master Plan was last reexamined in December of 2019. The following goals, objectives, and recommendations of the Master Plan may be relevant to this application: • Maintain the existing scale of the community. • Improve and maintain existing residential neighborhoods. • Encourage appropriate residential development. 6. Planning Comments a. The applicant should discuss the proposed project, addressing the general scale and scope of improvements proposed for the site. b. The application as proposed will require a D-1 use variance for non-compliance with the permitted principal use requirements for uses in the R-T Residential District. With any ‘d’ variance, the applicant has an enhanced burden of proof to demonstrate that both the positive and negative criteria can be satisfied before the Board can grant a ‘d’ variance: i. Positive Criteria: The applicant must show that there are special reasons to grant the variance. Special reasons can come in one of three forms: 1) that there is an economic inutility in using the property for one of the permitted uses in the district; 2) that the proposed use is considered “inherently beneficial”; or 3) that the proposed use would

File revisions (1)