OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH 8" X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X INLET GRT.=237.31' INV.=234.44' DR. MH. RIM = 237.64' INV.(a)= 232.59' INV.(b)= 232.74' INV.(c)= 234.03' SAN. SEWER MH. RIM = 237.43 INV.(a)= 228.50' INV.(b)= 228.56' INV.(c)= 228.99' INV.(d)= 231.61' E E FRANKLIN AVENUE (60' WIDE) (ASPHALT) 125.00'-TIE E S 21°18'27" W 100.00' S 68°41'33" E 100.00' N 21°18'27" E100.00' N 68°41'33" W 100.00' X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X ELM STREET (50' WIDE) (ASPHALT) LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LIMIT OF DISTURBANCE (10,362 SF, 0.24 AC) LIMITS OF CONCRETE SIDEWALK TO BE REMOVED LIMITS OF BELGIAN BLOCK CURB TO BE REMOVED EE X X X X X X X X X X X X X X X X X X X X X 236 236 236 MH SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF PROPOSED SILT FENCE (TYPICAL) 50' 20' PROPOSED STABILIZED CONSTRUCTION ENTRANCE SF SF SF SF SF SF SF SF PROPOSED SOIL STOCKPILE PROPOSED INLET FILTER PROPOSED TRENCH DRAIN FILTER Z:\RUTHERFORD\RUT\2021\RUT-210050 MANUEL VEGA - 66 FRANKLIN AVENUE, WEST ORANGE, NJ\CADD\PLOT\RDP-07-SESC.DWG ISSUE DATE DESCRIPTION NOT APPROVED FOR CONSTRUCTION PRELIMINARY & FINAL MAJOR SITE PLAN BY TITLE: SCALE: PROJECT ID: DRAWING: PROPOSED SITE IMPROVEMENTS ESSEX COUNTY, NEW JERSEY RUT-210050 01 10/08/2024 FOR MUNICIPAL RESUBMISSIONJLO TOWNSHIP OF WEST ORANGE 66 FRANKLIN AVENUE BLOCK 134.02, LOTS 75.03, 79 & 81 Rutherford, NJ · New York, NY · Boston, MA Princeton, NJ · Tampa, FL · Detroit, MI www.stonefieldeng.com Headquarters: 92 Park Avenue, Rutherford, NJ 07070 Phone 201.340.4468 · Fax 201.340.4472 M. VEGA INVESTMENTS LLC AFTON SAVITZ, P.E. NEW JERSEY LICENSE No. 57674 LICENSED PROFESSIONAL ENGINEER GRAPHIC SCALE IN FEET 0' 20'10'10' 1" = 10' SOIL EROSION & SEDIMENT CONTROL PLAN C-7 1" = 10' SYMBOL DESCRIPTION PROPERTY BOUNDARY ADJACENT PROPERTY BOUNDARY PROPOSED LIMIT OF

Page 7

ED PROFESSIONAL ENGINEER GRAPHIC SCALE IN FEET 0' 20'10'10' 1" = 10' SOIL EROSION & SEDIMENT CONTROL PLAN C-7 1" = 10' SYMBOL DESCRIPTION PROPERTY BOUNDARY ADJACENT PROPERTY BOUNDARY PROPOSED LIMIT OF DISTURBANCELOD PROPOSED SILT FENCESF PROPOSED TREE PROTECTION FENCETPF PROPOSED STOCKPILE & EQUIPMENT STORAGE PROPOSED STABILIZED CONSTRUCTION ENTRANCE PROPOSED INLET PROTECTION FILTER HUDSON ESSEX PASSAIC SOIL COSERVATION DISTRICT SOIL EROSION AND SEDIMENT CONTROL NOTES REVISED 2017 1. THE CONTRACTOR IS RESPONSIBLE FOR SOIL EROSION AND SEDIMENT CONTROL IN ACCORDANCE WITH LOCAL, STATE, AND FEDERAL REQUIREMENTS. 2. THE CONTRACTOR IS RESPONSIBLE FOR DUST CONTROL IN COMPLIANCE WITH LOCAL, STATE, AND FEDERAL AIR QUALITY STANDARDS. 3. THE CONTRACTOR IS RESPONSIBLE TO INSPECT ALL SOIL EROSION AND SEDIMENT CONTROL MEASURES WEEKLY AND AFTER A PRECIPITATION EVENT GREATER THAN 1 INCH. THE CONTRACTOR SHALL MAINTAIN AN INSPECTION LOG ON SITE AND DOCUMENT CORRECTIVE ACTION TAKEN THROUGHOUT THE COURSE OF CONSTRUCTION AS REQUIRED. 4. ALL SOIL EROSION AND SEDIMENT CONTROL PRACTICES ON THIS PLAN WILL BE CONSTRUCTED IN ACCORDANCE WITH THE “NEW JERSEY STANDARDS FOR SOIL EROSION AND SEDIMENT CONTROL” 7TH EDITION LAST REVISED JULY 2017, EFFECTIVE DECEMBER 2017. THESE MEASURES WILL BE INSTALLED PRIOR TO ANY MAJOR SOIL DISTURBANCE OR IN THEIR PROPER SEQUENCE AND MAINTAINED UNTIL PERMANENT PROTECTION IS ESTABLISHED. 5. SOIL TO BE EXPOSED OR STOCKPILED FOR A PERIOD OF GREATER THAN 14 DAYS, AND NOT UNDER ACTIVE CONSTRUCTION, MAY BE REQUIRED TO BE TEMPORARILY MULCHED, AND SEEDED OR OTHERWISE PROVIDED WITH VEGETATIVE COVER AS PER APPENDIX A3. THIS TEMPORARY COVER SHALL BE MAINTAINED UNTIL SUCH TIME WHEREBY PERMANENT RESTABILIZATION IS ESTABLISHED. 6. SEEDING DATES: THE FOLLOWING SEEDING DATES ARE RECOMMENDED TO BEST ESTABLISH PERMANENT VEGETATIVE COVER WITHIN MOST LOCATIONS IN THE HEPSCD: SPRING - 3/1-5/15 AND FALL - 8/15 - 10/1 7. SEDIMENT FENCES ARE TO BE PROPERLY TRENCHED AND MAINTAINED UNTIL PERMANENT VEGETATIVE COVER IS ESTABLISHED. 8. ALL STORM DRAINAGE INLETS SHALL BE PROTECTED BY ONE OF THE PRACTICES ACCEPTED IN THE STANDARDS, AND PROTECTION SHALL REMAIN UNTIL PERMANENT STABILIZATION HAS BEEN ESTABLISHED. STORM DRAINAGE OUTLET POINTS SHALL BE PROTECTED AS REQUIRED BEFORE THEY BECOME FUNCTIONAL. 9. MULCH MATERIALS SHALL BE UN-ROTTED SMALL GRAIN STRAW APPLIED AT THE RATE OF 70 TO 90

Page 7

HAS BEEN ESTABLISHED. STORM DRAINAGE OUTLET POINTS SHALL BE PROTECTED AS REQUIRED BEFORE THEY BECOME FUNCTIONAL. 9. MULCH MATERIALS SHALL BE UN-ROTTED SMALL GRAIN STRAW APPLIED AT THE RATE OF 70 TO 90 POUNDS PER 1,000 SQUARE FEET AND ANCHORED WITH A MULCH ANCHORING TOOL, LIQUID MULCH BINDERS, OR NETTING TIE DOWN. OTHER SUITABLE MATERIALS MAY BE USED IF APPROVED BY THE SOIL CONSERVATION DISTRICT. 10. ALL EROSION CONTROL DEVICES SHALL BE PERIODICALLY INSPECTED, MAINTAINED AND CORRECTED BY THE CONTRACTOR. ANY DAMAGE INCURRED BY EROSION SHALL BE RECTIFIED IMMEDIATELY. 11. THE HUDSON-ESSEX-PASSAIC SOIL CONSERVATION DISTRICT WILL BE NOTIFIED IN WRITING AT LEAST 48 HOURS PRIOR TO ANY SOIL DISTURBING ACTIVITIES. FAX - (862) 333-4507 OR EMAIL - INFORMATION@HEPSCD.ORG 12. THE APPLICANT MUST OBTAIN A DISTRICT ISSUED REPORT-OF-COMPLIANCE PRIOR TO APPLYING FOR THE CERTIFICATE OF OCCUPANCY OR TEMPORARY CERTIFICATE OF OCCUPANCY FROM THE RESPECTIVE MUNICIPALITY, NJ - DCA OR ANY OTHER CONTROLLING AGENCY. CONTACT THE DISTRICT AT 862-333-4505 TO REQUEST A FINAL INSPECTION, GIVING ADVANCED NOTICE UPON COMPLETION OF THE RESTABILIZATION MEASURES. A PERFORMANCE DEPOSIT MAY BE POSTED WITH THE DISTRICT WHEN WINTER WEATHER OR SNOW COVER PROHIBITS THE PROPER APPLICATION OF SEED, MULCH, FERTILIZER OR HYDRO-SEED. 13. PAVED ROADWAYS MUST BE KEPT CLEAN AT ALL TIMES. DO NOT UTILIZE A FIRE OR GARDEN HOSE TO CLEAN ROADS UNLESS THE RUNOFF IS DIRECTED TO A PROPERLY DESIGNED AND FUNCTIONING SEDIMENT BASIN. WATER PUMPED OUT OF THE EXCAVATED AREAS CONTAINS SEDIMENTS THAT MUST BE REMOVED PRIOR TO DISCHARGING TO RECEIVING BODIES OF WATER USING REMOVABLE PUMPING STATIONS, SUMP PITS, PORTABLE SEDIMENTATION TANKS AND/OR SILT CONTROL BAGS. 14. ALL SURFACES HAVING LAWN OR LANDSCAPING AS FINAL COVER ARE TO BE PROVIDED TOPSOIL PRIOR TO RE-SEEDING, SODDING OR PLANTING. A DEPTH OF 5.0 INCHES, FIRMED IN PLACE, IS REQUIRED, AS PER THE STANDARDS FOR TOPSOILING AND LAND GRADING, EFFECTIVE DECEMBER 2017. 15. ALL PLAN REVISIONS MUST BE SUBMITTED TO THE DISTRICT FOR PROPER REVIEW AND APPROVAL. 16. A CRUSHED STONE WHEEL CLEANING TRACKING-PAD IS TO BE INSTALLED AT ALL SITE EXITS USING 2 ½ -1” CRUSHED ANGULAR STONE (ASTM 2 OR 3) TO A MINIMUM LENGTH OF 50 FEET AND MINIMUM DEPTH OF 6”. ALL DRIVEWAYS MUST BE PROVIDED WITH CRUSHED STONE UNTIL PAVING IS COMPLETE. 17. STEEP SLOPES INCURRING DISTURBANCE MAY REQUIRE

Page 7

ONE (ASTM 2 OR 3) TO A MINIMUM LENGTH OF 50 FEET AND MINIMUM DEPTH OF 6”. ALL DRIVEWAYS MUST BE PROVIDED WITH CRUSHED STONE UNTIL PAVING IS COMPLETE. 17. STEEP SLOPES INCURRING DISTURBANCE MAY REQUIRE ADDITIONAL STABILIZATION MEASURES. THESE “SPECIAL” MEASURES SHALL BE DESIGNED BY THE APPLICANT'S ENGINEER AND BE APPROVED BY THE SOIL CONSERVATION DISTRICT. 18. THE HUDSON-ESSEX-PASSAIC SOIL CONSERVATION DISTRICT SHALL BE NOTIFIED, IN WRITING, FOR THE SALE OF ANY PORTION OF THE PROJECT OR FOR THE SALE OF INDIVIDUAL LOTS. NEW OWNERS' INFORMATION SHALL BE PROVIDED. ADDITIONAL MEASURES DEEMED NECESSARY BY DISTRICT OFFICIALS SHALL BE IMPLEMENTED AS CONDITIONS WARRANT. SOIL CHARACTERISTICS CHART TYPE OF SOIL URBAN LAND, BOONTON SUBSTRATUM - BOONTON COMPLEX, RED SANDSTONE LOWLAND (USBOOB) PERCENT OF SITE COVERAGE 100% HYDROLOGIC SOIL GROUP C DEPTH TO RESTRICTIVE LAYER 20 TO 36 INCHES TO FRAGIPAN SOIL PERMEABILITY 0.06 TO 0.20 IN/HR DEPTH TO WATER TABLE > 80 INCHES DUST CONTROL NOTES 1. MULCHES - SEE STANDARD OF STABILIZATION WITH MULCHES ONLY, PG. 5-1 2. VEGETATIVE COVER - SEE STANDARD FOR: TEMPORARY VEGETATIVE COVER, PG. 7-1, PERMANENT VEGETATIVE COVER FOR SOIL STABILIZATION PG. 4-1 AND PERMANENT STABILIZATION WITH SOD, PG. 6-1 3. SPRAY-ON ADHESIVES - ON MINERAL SOILS (NOT EFFECTIVE ON MUCK SOILS). KEEP TRAFFIC OFF THESE AREAS. 4. TILLAGE - TO ROUGHEN SURFACE AND BRING CLODS TO THE SURFACE. THIS IS A TEMPORARY EMERGENCY MEASURE WHICH SHOULD BE USED BEFORE SOIL BLOWING STARTS. BEGIN PLOWING ON WINDWARD SIDE OF SITE. CHISEL-TYPE PLOWS SPACED ABOUT 12 INCHES APART AND SPRING-TOOTHED HARROWS ARE EXAMPLES OF EQUIPMENT WHICH MAY PRODUCE THE DESIRED EFFECT. 5. SPRINKLING - SITE IS SPRINKLED UNTIL THE SURFACE IS WET. 6. BARRIERS - SOLID BOARD FENCES, SNOW FENCES, BURLAP FENCES, CRATE WALLS, BALES OF HAY AND SIMILAR MATERIAL CAN BE USED TO CONTROL AIR CURRENTS AND SOIL BLOWING. 7. CALCIUM CHLORIDE - SHALL BE IN THE FORM OF LOOSE, DRY GRANULES OR FLAKES FINE ENOUGH TO FEED THROUGH COMMONLY USED SPREADERS AT A RATE THAT WILL KEEP SURFACE MOIST BUT NOT CAUSE POLLUTION OR PLANT DAMAGE. IF USED ON STEEPER SLOPES, THEN USE OTHER PRACTICES TO PREVENT WASHING INTO STREAMS OR ACCUMULATION AROUND PLANTS. 8. STONE - COVER SURFACE WITH CRUSHED STONE OR COARSE GRAVEL. STABILIZATION SPECIFICATIONS: 1.A. TEMPORARY SEEDING AND MULCHING: GROUND LIMESTONE - APPLIED UNIFORMLY ACCORDING TO SOIL

Page 7

N AROUND PLANTS. 8. STONE - COVER SURFACE WITH CRUSHED STONE OR COARSE GRAVEL. STABILIZATION SPECIFICATIONS: 1.A. TEMPORARY SEEDING AND MULCHING: GROUND LIMESTONE - APPLIED UNIFORMLY ACCORDING TO SOIL TEST RECOMMENDATIONS. FERTILIZER - APPLY 11LBS./1,000 SF OF 10-20-10 OR EQUIVALENT WITH 50% WATER INSOLUBLE NITROGEN (UNLESS A SOIL TEST INDICATES OTHERWISE) WORKED INTO THE SOIL A MINIMUM OF 4". SEED - PERENNIAL RYEGRASS 100 LBS./ACRE (2.3 LBS./1,000 SF) OR OTHER APPROVED SEEDS; PLANT BETWEEN MARCH 1 AND MAY 15 OR BETWEEN AUGUST 15 AND OCTOBER 1. MULCH - UNROTTED STRAW OR HAY AT A RATE OF 70 TO 90 LBS./1,000 SF APPLIED TO ACHIEVE 95% SOIL SURFACE COVERAGE. MULCH SHALL BE ANCHORED BY APPROVED METHODS (I.E. PEG AND TWINE, MULCH NETTING, OR LIQUID MULCH BINDER). 1.B. PERMANENT SEEDING AND MULCHING: TOPSOIL - UNIFORM APPLICATION TO A DEPTH OF 5" (UNSETTLED). GROUND LIMESTONE - APPLIED UNIFORMLY ACCORDING TO SOIL TEST RECOMMENDATIONS. FERTILIZER - APPLY 11 LBS./1,000 SF OF 10-10-10 OR EQUIVALENT WITH 50% WATER INSOLUBLE NITROGEN (UNLESS A SOIL TEST INDICATES OTHERWISE) WORKED INTO THE SOIL A MINIMUM OF 4". SEED - TURF TYPE TALL FESCUE (BLEND OF 3 CULTIVARS) 350 LBS./ACRE (8 LBS./1,000 SF) OR OTHER APPROVED SEEDS; PLANT BETWEEN MARCH 1 AND OCTOBER 1 (SUMMER SEEDINGS REQUIRE IRRIGATION) MULCH - UNROTTED STRAW OR HAY AT A RATE OF 70 TO 90 LBS./1,000 SF APPLIED TO ACHIEVE 95% SOIL SURFACE COVERAGE. MULCH SHALL BE ANCHORED BY APPROVED METHODS (I.E. PEG AND TWINE, MULCH NETTING, OR LIQUID MULCH BINDER). R Know what's below Call before you dig. NOTES: 1. SECURELY FASTEN GEOTEXTILE TO FENCE POST BY USE OF WIRE TIES, HOG RINGS, STAPLES OR POCKETS. FOUR TO SIX FASTENERS PER POST. 2. GEOTEXTILE FABRIC TO BE EMBEDDED 6" (MIN.) AND TAMP IN PLACE. 3. SECURELY FASTEN ENDS OF INDIVIDUAL ROLLS OF GEOTEXTILE TO A POST BY WRAPPING EACH END OF THE GEOTEXTILE AROUND THE POST TWICE AND ATTACHING AS SPECIFIED IN NOTE 1 ABOVE. SPLICING OF INDIVIDUAL ROLLS SHALL NOT OCCUR AT LOW POINTS. 4. SET SILT FENCE WITHIN PROJECT LIMITS. 10'-0" IS DESIRABLE. SILT FENCE DETAIL NOT TO SCALE 6" 6" 2' - 0" 2' - 0" (MIN.) 10' DESIRABLE FLOW DRAWSTRING RUNNING THROUGH FABRIC ALONG TOP OF FENCE2" x 2" FENCE POST 2' - 0" 2' - 0" (MIN.) DRIVE POSTS PLUMB OR SLIGHTLY UPHILL EMBED FABRIC 6" MINIMUM AND TAMP IN PLACE SPACE 8'-0" O.C. SECURELY FASTEN FABRIC TO POSTS TOE OF SLOPE EMBED FABRIC 6" MINIMUM AND TAMP

Page 7

OST 2' - 0" 2' - 0" (MIN.) DRIVE POSTS PLUMB OR SLIGHTLY UPHILL EMBED FABRIC 6" MINIMUM AND TAMP IN PLACE SPACE 8'-0" O.C. SECURELY FASTEN FABRIC TO POSTS TOE OF SLOPE EMBED FABRIC 6" MINIMUM AND TAMP IN PLACE NOT TO SCALE STABILIZED CONSTRUCTION ACCESS DETAIL 50' MINIMUM (SEE CHART) 6" MIN. GEOTEXTILE FABRIC EXISTING GROUND PUBLIC ROADWAY 6" 6" 15' MINIMUM (SEE NOTE 2) NOTES: 1. STONE SHALL BE ASTM C-33, SIZE No. 2 (2.5" TO 1.5") OR No. 3 (2" TO 1") CLEAN CRUSHED ANGULAR STONE. 2. WIDTH SHALL BE 15' MINIMUM OR THE FULL WIDTH OF THE ACCESS POINT, WHICHEVER IS GREATER. 3. STORMWATER FROM UP-SLOPE AREAS SHALL BE DIVERTED AWAY FROM THE STABILIZED PAD, WHERE POSSIBLE. AT POORLY DRAINED LOCATIONS, SUBSURFACE DRAINAGE GRAVEL FILTER OR GEOTEXTILE SHALL BE INSTALLED BEFORE THE STABILIZED CONSTRUCTION ENTRANCE. 4. WHERE THE SLOPE OF THE ROADWAY EXCEEDS 5%, A STABILIZED BASE OF HOT MIX ASPHALT BASE COURSE SHALL BE INSTALLED. THE TYPE AND THICKNESS OF THE BASE COURSE AND USE OF DENSE GRADED AGGREGATE SUB-BASE SHALL BE AS PRESCRIBED BY LOCAL MUNICIPAL ORDINANCE OR GOVERNING AUTHORITY. 5. CONTRACTOR SHALL PROVIDE A SMOOTH TRANSITION BETWEEN THE STABILIZED CONSTRUCTION ACCESS AND THE PUBLIC ROADWAY. CRUSHED STONE PAD (SEE NOTE 1) 50' MINIMUM (SEE CHART) CRUSHED STONE PAD (SEE NOTE 1) PUBLIC ROADWAY PLAN VIEW PROFILE VIEW 0% TO 2% 100 FEET50 FEET 2% TO 5% 200 FEET100 FEET > 5% SEE NOTE 4 LENGTH OF STONE REQ'D PUBLIC FINECOARSE GRAINED SOILSGRAINED SOILSROADWAY SLOPE OF 3 1 SOIL STOCKPILE DETAIL NOT TO SCALE STOCKPILE SHALL NOT EXCEED MAXIMUM 3 : 1 SIDE SLOPE MAINTAIN SOIL STOCKPILE STABILIZATION THROUGHOUT CONSTRUCTION INSTALL SILT FENCE AROUND SOIL STOCKPILE (SEE DETAIL) NOTES: 1. STOCKPILES SHALL BE SITUATED SO AS NOT TO OBSTRUCT NATURAL DRAINAGE OR CAUSE OFF-SITE ENVIRONMENTAL DAMAGE. 2. STOCKPILES SHALL BE STABILIZED IN ACCORDANCE WITH THE STANDARDS FOR PERMANENT OR TEMPORARY VEGETATIVE COVER FOR SOIL STABILIZATION, AS APPROPRIATE (SEE SOIL EROSION NOTES). 35' MAXIMUM HEIGHT LENGTH=L WIDTH=W DEPTH=D DUMP STRAP 1" REBAR FOR BAG REMOVAL FROM INLET DUMP STRAP FOAM CURB OPENING DUMP STRAPS 1" REBAR FOR BAG REMOVAL FROM INLET EXPANSION RESTRAINT (1/4" NYLON ROPE, 2" FLAT WASHERS) INLET FILTER BAG DUMP STRAPS (2 EACH) FOAM BAG DETAIL INSTALLATION DETAIL INLET GRATE INLET FILTER BAG DETAIL NOT TO SCALE NOTES: 1. THE FILTER BAG SHALL SAFELY PASS FLOWS GREATER THAN THE 1-YEAR

Page 7

ERS) INLET FILTER BAG DUMP STRAPS (2 EACH) FOAM BAG DETAIL INSTALLATION DETAIL INLET GRATE INLET FILTER BAG DETAIL NOT TO SCALE NOTES: 1. THE FILTER BAG SHALL SAFELY PASS FLOWS GREATER THAN THE 1-YEAR 24-HOUR STORM EVENT. 2. SEDIMENT REMOVAL AND MAINTENANCE SHALL BE PERFORMED FREQUENTLY AND AFTER EVERY STORM EVENT. EMERGENCY OVERFLOW PORT THE SUBJECT PROPERTY IS LOCATED WITHIN AN URBAN REDEVELOPMENT AREA (METROPOLITAN PLANNING AREA (PA1)) AND IS THEREFORE EXEMPT FROM COMPACTION REMEDIATION