Supporting Documentation · Aug 20, 2026
66 Franklin Ave ZB 24 18 Completeness Memo February 19 2025 rcd 2 19 2025
8ee1251342ef0cd262d287af6795331d0047af88d54e4778d8f3117eb9031137Indexed text · page 2
Show all pages2 | Page 105 Grove Street, Suite 3 Montclair, NJ 07042 www.Nishuanegroup.com 973.954.2677 10. Summary of Approvals and Permits, prepared by Stonefield Engineering & Design, dated October 8, 2024. 11. Stormwater Management Statement, prepared by Stonefield Engineering & Design, dated October 8, 2024. 12. Solid Waste Management Plan, prepared by Stonefield Engineering & Design, dated October 8, 2024. 13. Truck Turn Exhibit, prepared by Stonefield Engineering & Design, dated August 16, 2022, last revised October 18, 2024. 14. List of property owners to be served notice, prepared on October 16, 2024. 15. Trucking Information. 16. Verification of Taxes & Sewer Charges Paid, dated December 11, 2024. Completeness This application requires preliminary and final site plan approval, and as such is required to submit a checklist for major site plan development along with the required items associated with a checklist. A blank checklist was submitted. Further, Section G was not properly completed and has conflicting information. The proposal provided proposes to develop a mixed use building with retail on the first floor and a residential unit on the second floor. This is not reflected in the submitted site plan and associated zoning table. In addition, the proposal goes on to propose the renovation of the existing building into a one-story retail business. It is unclear at this point, what is actually being proposed by the applicant. The applicant also did not provide Reasons for Relief in accordance with 4B-4E in Section G. Because of the lack of a completed checklist and lack of other information discussed above, no further completeness or planning review was conducted. This application is deemed INCOMPLETE.
File revisions (1)
- Sep 29, 2026
8ee1251342ef144,252 bytes