Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Aug 20, 2026

25 04 25 Review 2 rcd 4 25 2025

Preserved file SHA-256f9f28e7f74e5d86dcc450df0f55d7912a2f9d272d856545df934adbdfc3ee361

Indexed text · page 2

Show all pages
Page 2

Consulting & Municipal eee ENGINEERS Chairman and Members of the West Orange Zoning Board April 25, 2025 Re: M. Vega Investments LLC (ZB-24-18) Our File No. 115.WRZ0134.V01 Preliminary & Final Major Site Plan with ‘C’ Page 2 and ‘D’ Variances - Review #2 In addition to the above, our office previously received the following information as part of the original submission for this application: e An unsigned set of Preliminary and Final Major Site Plan drawings (11 sheets) prepared by Afton Savitz, PE with Stonefield Engineering & Design of Rutherford, New Jersey dated October 8, 2024. ¢ Aprint of a Boundary & Topographic Survey (1 sheet) prepared by Thomas F. Miller, PLS with Stonefield Engineering & Design and bearing a latest revision date of June 28, 2021. e Aprint of a Boundary & Topographic Survey (1 sheet) prepared by Thomas F. Miller, PLS with Stonefield Engineering & Design and bearing a latest revision date of March 19, 2024. e An unsigned set of Truck Turn Exhibits (4 sheets) prepared by Afton Savitz, PE and bearing a latest revision date of October 8, 2024. e Anunsigned Site Photo Exhibit (1 sheet) prepared by Afton Savitz, PE dated October 21, 2024. e A Solid Waste Management Plan prepared by Afton Savitz, PE dated October 8, 2024. e A Stormwater Management Statement prepared by Afton Savitz, PE dated October 8, 2024. Included with the Stormwater Management Statement is a set of unsigned Drainage Area Maps (2 sheets) prepared by Afton Savitz, PE dated October 8, 2024. e Acompleted Application Package. e An undated Proposal which describes the proposed improvements at the site and details the variances that are requested by the Applicant. e A blank Site Plan/Subdivision Checklist. e A blank Sustainability Checklist Form. e Acopy of a December 11, 2024 statement from the Office of the Tax Collector which states that the taxes on lot 79, block 134.02 are paid until January 31, 2025. e Acopy of a December 11, 2024 statement from the Office of the Tax Collector which states that the taxes on lot 81, block 134.02 are paid until January 31, 2025. ¢ A copy of a List of Owners Within 200 Feet of Block 134.02, Lots 75.03, 79, and 81 prepared by the Office of the Assessor dated October 16, 2024. ¢ A Summary of Approvals and Permits prepared by Stonefield Engineering & Design LLC dated October 8, 2024. ¢ Adocument entitled “Trucking

Page 2

pared by the Office of the Assessor dated October 16, 2024. ¢ A Summary of Approvals and Permits prepared by Stonefield Engineering & Design LLC dated October 8, 2024. ¢ Adocument entitled “Trucking Information” which addresses the number of trucks and the types of trucks that wil be parked at the site as well as provides a schedule of whey the trucks will leave and return to the site on a daily basis. S:\West OrangelZoning Board\1 15 WRZ0134 VOt - M. Vega Investments, LLC\25-04-25 Review #2 doox nT

File revisions (1)