Supporting Documentation · Aug 20, 2026
ZB 24 18 Completeness Memo June 5 2025 4901 3458 4139 v1 rcd 7 20 25
dea6ea625e12eeffe1cd5569c3f3ca5a89752e874e24c8d84ac8afe7a3bd9115Indexed text · page 1
Show all pages1 | Page 105 Grove Street, Suite 3 Montclair, NJ 07042 www.Nishuanegroup.com 973.954.2677 June 5, 2025 Roosevelt Donat, Special Council Murphy Schiller & Wilkes LLP One Gateway Center, Suite 400 Newark Re: Request for Information and Completeness Determination 66 Franklin Ave Block #134,02, Lots 75.03, 79, 81 Preliminary and Major Site Plan Approval with variances ZB-24-18 Dear Mr. Donat, This office has reviewed the updated material submitted by M Vega Investments, LLC (“Applicant”). The Applicant filed an application with the West Orange Board of Adjustment for a preliminary and major site plan approval in connection with the development of a retail business and 8 parking spaces. After reviewing the documents, please provide the following information: 1. Are the parking spaces directly related to the retail business, or leased out to a separate entity? 2. The previous application, ZB-21-01, which was denied on April 20, 2023. In this application, the D-1 Use Variance required was for the commercial vehicle parking. However, in your Justification for Relief, you state the D-1 Use Variance being sought is for the retail business, which is a permitted use within the B-1 zone. Please update the Justification for Relief if necessary as determined by the responses in Item 3. 3. To that effect, please provide the following information: a. Number of trucks to be parked on the site b. Verify if the type of trucks will be limited Ford F-550 Pickup only ( as indicated on the plan), if not please indicate the length, width, body weight of other vehicles to be parked on site c. Times trucks would be leaving and entering the site on a daily basis.
File revisions (1)
- Sep 29, 2026
dea6ea625e12165,835 bytes