Supporting Documentation · Sep 2, 2026
05072026 SPRAB Meeting Review
def323ae6ffcb6bcce6306da3150f42974a13f1dd5be48b9a66f8688a016c28eIndexed text · page 2
Show all pageso The pool and patio will be removed and replaced with a home. The existing home is unique. Board Engineer: Applicant needs to submit a revised plat that meets the requirements for a major subdivision. Applicant shall outline on the revised plans if the development will be major or minor in order to assess compliance with stormwater management standards. o Should include new impervious coverage and the amount of site disturbance proposed. o Should include conceptual grading plans. For stormwater management, the revised proposal should propose alternatives to a drywell system first. Bioretention, rain garde, porous pavement, etc. should be considered first. Board Planner: Response needed to March 3rd Completeness Letter The proposal is creating several noncompliant conditions. Justification will need to be prepared and presented to the Board. A concept/ floor plan is needed to assess compliance with other standards, including impervious coverage. Questions raised about the possibility of creating two lots instead of one. The zone permits certain standards, and the Applicant will need to provide a strong argument to the Board addressing concerns and alternatives. Conclusion: Applicant must submit revised materials to meet the requirements of a major subdivision, including the items requested by the Board Engineer and Planner. Applicant must submit a list of the waivers being requested. The Review Board strongly recommended that an environmental impact statement be submitted. Currently, the application is deemed incomplete.
File revisions (1)
- Sep 29, 2026
def323ae6ffc260,056 bytes