Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Aug 20, 2026

Submitted Application 10232024 4872 5331 9410 v1 rcd 10 23 24

Preserved file SHA-256d66074626584d506fa9fa8953d50235894ed99950453421296a914d7e020566c

Indexed text · page 36

Show all pages
Page 36

VI. CHAPTER __25-51.7.2_ SHALL BE AND HEREBY IS AMENDED AND SUPERCEDED TO READ AS FOLLOWS: 25-51.7.2 Major Site Plan Requirements - Final Stage. A complete application for a final major site plan shall include all applicable administrative requirements as delineated in subsection 25-51.2 and the following information on one (1) or more maps or attached to the application form if it cannot be mapped, a Verificution that all of the conditions of the preliminary approval have been met. b, A map or maps which comply with this chapter depicting that portion of the project for which final approval is being requested. c. ‘A developer's agreement if required by the preliminary approval. d. A Statement indicating the reasons for any deviations from appraved preliminary site plan. e, Auy off-tract improvement contributions if required. £ Four (4) copies of a map, referred to as a "Run Card”, depicting the location of all fire hydrants within the subject property, and depicting the surrounding streets, based on a scale of one (1) inch equaling four hundred (400) feet, and contained on an eight and one-half by eleven (8.5 x 11) inch paper within an area not to exceed seven and one-half (7.5) inches in width and eight (8) inches in height. VU. CHAPTER _25-51.8 SHALL BE AND HEREBY IS AMENDED AND SUPERCEDED TO READ AS FOLLOWS: 25-518 Conditional Use Requirements. | No conditional use application shall be considered complete unless it fully conforms with Subsections 25-51.2, 25-51,6 and 25-51.7.1 as well as the following requirements: a A notetion indicating the section of this chapter that allows the conditional use as proposed. b A listing of the conditional use standards that apply to the subject proposal. VOL CHAPTER 25-519 SHALL BE AND HEREBY 1S AMENDED AND SUPERCEDED TO READ AS FOLLOWS: 235-51,9.."C" Variance Requirements, No “c" or bulk vaciance application shall be considered complete unless it fully conforms with subsection 25-51.2 as well as the following requirements: a A map, either ja conformance with subsections 25-513, 25-51.4, 25-51.5, 25-51.6 and 25-51.7.1 or if the application is to be bifurcated, a separate map, signed and sealed by an architect, engineer, planner or surveyor which provides sufficient data (i.c., setbacks, lot

File revisions (1)