Supporting Documentation · Aug 20, 2026
Submitted Application 10232024 4872 5331 9410 v1 rcd 10 23 24
d66074626584d506fa9fa8953d50235894ed99950453421296a914d7e020566cIndexed text · page 41
Show all pages7. Details of roofing materials designed to reduce the urban heal island effect such as: i. Construction of roof top gardens to reduce solar gain in summer and insulate in winter ii. Use of roofing materials that are no darker than a light gray or demonstrate how alternate roofing materials reduce the urban heat island effect 8, Details of any sustainable stormwater systems employed such as: i. Bioswales/ raingardens i, Permeable surfaces iii, Grey water systems iv. Retention and detention facilities y. Continuous trenching 9. A list of native and’ well adapted specics used in landscaping to eliminate the | need for fertilization and pesticides. c. For each of the items listed on the Sustainability checklist form applicants must indicate the extent to which they are incorporating such a measure in the projector, * alternatively, indicate the reason(s) why the measure is not being incorporated in the project. t I. REPEAL OF CONFLICTING ORDINANCES Any Ordinances of the Township which are in conilict with this Ordinance are hereby repealed to the extent of such conflict. IV. SEVERABILITY If any part of this Ordinance shall he deemed invalid, such parts shell be severed and the invalidity thereof shal! not affect the remaining parts of this Ordinance. Vv, EFFECTIVE DATE This Ordinance shall take effect upot final passage and publication in accordance with | the law. ¢ fess Asus J eteyfGyffinp, Pounel President , | Mayor Introduced: April 14, 2015 Adopted: May 12, 2014 Azof'Aprit 2. 2015
File revisions (1)
- Sep 29, 2026
d660746265841,664,264 bytes