Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Sep 2, 2026

Affidavit of Proof of Service and Publication

Preserved file SHA-256ad1f8f25001c474b26602816a863ee23182bf44d5fa856b7f06ca8aa66cbdf57

Indexed text · page 26

Show all pages
Page 26

not necessarily limited to, grading, paving, curbing, sidewalks, new utilities, retaining walls, and stormwater management infrastructure. As part of the Application, the Applicant is requesting bulk “(c)” variances, pursuant to N.J.S.A. 40:55D-70(c)(1)-(2), to permit deviations from the following Land Use Regulations as set forth in the Municipal Code of the Township of West Orange (the “Code”): (i) Minimum Lot Area for Proposed Lot 86.01 (§25-7.1, Attachment 3 - Table of District Regulations, Part B: Bulk Standards): Proposed lot area of 7,199 square feet, where a minimum of 10,000 square feet is required; (ii) Minimum Lot Area for Proposed Lot 86.02 (§25-7.1, Attachment 3 - Table of District Regulations, Part B: Bulk Standards): Proposed lot area of 8,505 square feet, where a minimum of 10,000 square feet is required; (iii) Minimum Lot Area for Proposed Lot 86.03 (§25-7.1, Attachment 3 - Table of District Regulations, Part B: Bulk Standards): Proposed lot area of 8,278 square feet, where a minimum of 10,000 square feet is required; (iv) Minimum Lot Width of Proposed Lot 86.01 (§25-7.1, Attachment 3 - Table of District Regulations, Part B: Bulk Standards): Lot width of 62.60 feet, where a minimum of 75 feet is required; (v) Minimum Side Yard Setback of Proposed Lot 6.02 (§25-7.1, Attachment 3 - Table of District Regulations, Part B: Bulk Standards): Proposed side yard setback of 8.34 feet, where a minimum of 10 feet is required. While the Applicant believes that, except as noted above, the Application is in conformance with the Code, all applicable zoning ordinances, site plan, and design requirements, the Applicant also requests any other approvals, design waivers, submission waivers, variances, deviations, interpretations, and/or exceptions from the Code, the Township of West Orange Land Use Regulations, and/or the General Ordinances of the Township of West Orange and/or continuations of any pre-existing non- conforming conditions, modifications of or relief from prior imposed conditions and other approvals reflected on the filed plans (as same may be further amended or revised from time to time without further notice), all as may be determined to be required for the Application during the review and processing of the Application, and/or based upon an analysis of the plans and testimony at the Hearing. As noted above, the Hearing will be conducted

Page 26

required for the Application during the review and processing of the Application, and/or based upon an analysis of the plans and testimony at the Hearing. As noted above, the Hearing will be conducted VIRTUALLY via Zoom. Zoom is a web and telephone conferencing service that is accessible at no charge to interested members of the public. The access information for the Hearing is as follows: To join the Hearing from your computer, tablet or smartphone: https://us02web.zoom.uSs/j/82210150937?pwd=aM3voSHdM vY1cWzvMLTIz3GcxJdlf0.1 You can also dial in using your phone: Webinar ID: 822 1015 0937 Passcode: 083483 Dial in: 646 931 3860 When this matter is called, you may appear or be represented by agent or attorney, to make any objections, offer any comments that you may have to the granting of the Application, introduce evidence, and/or question the Applicant’s representatives and/or the Board’s professionals / consultants. Individuals lacking the technical know-how or who have questions regarding acceccinn the Hearing chauld cantact the Planning Raard

File revisions (1)