Supporting Documentation · Sep 17, 2026
13 Porter Rd Application package rcd 6 2 2026
b4fb2ab8971ca51dca8b803c89b071e202c26a8d53966cbdd2771199000a4563Indexed text · page 17
Show all pagesPROPOSED RESIDENTIAL ADDITION 13 PORTER ROAD A-100 BASEMENT LEVEL PLAN - PROPOSED TO COMPLETE THE NEW WORK. A-101 FIRST FLOOR PLAN - PROPOSED A-102 ROOF PLAN AND DETAILS 18. ALL MANUFACTURER'S MATERIALS, COMPONENTS, FASTENERS, ASSEMBLIES, ETC. SHALL BE HANDLED AND A-200 ELEVATIONS, PAGE 1 INSTALLED IN ACCORDANCE TO WITH MANUFACTURERS INSTRUCTIONS AND RECOMMENDATIONS. WHERE BRAND A-201 ELEVATIONS, PAGE 2, TYPICAL WALL SECTION NAMES AND MANUFACTURED PRODUCTS ARE CALLED FOR, APPROVED EQUALS WHICH MEET APPLICABLE A-202 BUILDING SECTIONS AND DETAILS STANDARDS AND SPECIFICATIONS MAY BE SUBSTITUTED WITH WRITTEN PERMISSION OF THE ARCHITECT OR ENGINEER, AND THE OWNER. WHENEVER BRAND NAMES OR SPECIFIC PRODUCT SYSTEMS ARE
ENGINEER, AND THE OWNER. WHENEVER BRAND NAMES OR SPECIFIC PRODUCT SYSTEMS ARE INDICATED IT SHALL SCOPE OF WORK BE CLEARLY UNDERSTOOD THAT SUCH IDENTIFICATION IS FOR THE PURPOSE OF ILLUSTRATING THE TYPE OF PRODUCT AND DEGREE OF QUALITY DESIRED. SUCH IDENTIFICATION IN NO WAY PRECLUDES THE CONTRACTOR BELOW IS A LIST OF ITEMS IN THE PROJECT BUT SHALL NOT BE LIMITED BY IT. THIS IS A LIST TO FROM USING PRODUCTS OF OTHER MANUFACTURERS WHICH CAN BE SHOWN IN ADVANCE TO BE OF LIKE AND OF ASSIST THE BIDDERS AND BUILDING DEPARTMENT TO UNDERSTAND THE SCOPE: EQUAL QUALITY. FOUNDATION SCOPE OF WORK: 19. ALL CHANGES SHALL BE REQUESTED IN WRITING AND MAY ONLY BE APPROVED IN WRITING BY THE ARCHITECT 1. NEW FOUNDATION AT BASEMENT LEVEL TO EXTEND GARAGE FOR STORAGE. OR ENGINEER AND THE OWNER PRIOR TO ANY CHANGES BEING MADE. 5/19/2026 4:24:58 PM LEVEL 1 SCOPE OF WORK: 20. THE ARCHITECT HAS THE RIGHT TO REJECT ANY PORTION OF WORK THAT IS POORLY INSTALLED, DOES NOT 1. SHORE UP AND
HAS THE RIGHT TO REJECT ANY PORTION OF WORK THAT IS POORLY INSTALLED, DOES NOT 1. SHORE UP AND AND PREPARE FOR DEMO OF EXISTING EXTERIOR BASEMENT WALL AS INDICATED MEET INDUSTRY STANDARD, UNAUTHORIZED, OR WORK DONE CONTRARY TO THE INTENT OF THE CONTRACT ON THE FLOOR PLAN DRAWING. DOCUMENTS. SUCH WORK SHALL BE REPLACED, REPAIRED OR REMOVED AT THE CONTRACTOR'S EXPENSE. 2. DEMO EXISTING NORTH WALL IN EXISTING BEDROOM AND PREPARE FOR NEW BATH/CLOSET ADDITION, 2 REFER TO DRAWINGS. 21. THE CONTRACTOR SHALL GUARANTEE ALL HIS WORK AND THE WORK OF HIS SUBCONTRACTORS FOR A PERIOD 3. ADD NEW 2x6 STUD WALLS, WINDOWS AND (2) INTERIOR DOORS AS INDICATED ON DRAWINGS. ONE YEAR AFTER RECEIVING FINAL ACCEPTANCE AND DO ALL REPAIR WORK AND REPLACEMENT AS NECESSARY 4. NEW SIDING AND ASPHALT SHINGLE ROOF, SOFFITS, GUTTERS & LEADERS. DURING THAT PERIOD AT THE CONTRACTOR'S EXPENSE. 5. NEW BATHROOM FIXTURES ZONING WORKSHEET 22. IN NO EVENT SHALL STRUCTURAL MEMBERS BE CUT OR DRILLED WITHOUT THE WRITTEN APPROVAL OF A
LICENSED STRUCTURAL ENGINEER. BASED ON NEW JERSEY CODES 2021 AND IBC 2021 NJ Ed. 23. THE CONTRACTOR SHALL PROVIDE SAFE AND SANITARY CONDITIONS WHERE DEMOLITION AND WRECKING ZONING ANALYSIS - R-6 SINGLE FAMILY RESIDENCE OPERATIONS ARE BEING CARRIED ON. WORK SHALL BE EXECUTED IN SUCH A MANNER THAT HAZARD FROM FIRE, TITLE PAGE BLOCK 175.24 LOT 3 POSSIBILITY OF INJURY, DANGER TO HEALTH AND CONDITIONS WHICH MAY CONSTITUTE A PUBLIC NUISANCE SHALL DESCRIPTION ALLOWED EXISTING PROPOSED VARIANCE REQD. BE MINIMIZED MINIMUM LOT AREA 6,000 s.f. 6,702 s.f. no change no ZONING MAP FRONT YARD 30 feet 31.1 feet no change no Drawn By: AJG Checked By: FC3
Drawn By: AJG Checked By: FC3 REAR YARD 30 feet 34.8 feet no change no SIDE YARD 10+8=18 feet aggr. 14.1+6.4=20.5 feet no change YES HEIGHT 30 feet 26'-0" no change no T-100 25-003 T-100 BLDG. COVERAGE 35% 20% 23% no 1 IMPERVIOUS COVERAGE 45% 39% 42% no 25-003 04-06-2025 © F E D C B A
File revisions (1)
- Sep 29, 2026
b4fb2ab8971c19,301,938 bytes