RCHITECT. THE REPRODUCTION DOCUMENTS, THE MORE STRINGENT SHALL TAKE PRECEDENCE. OF THIS DRAWING FOR THE PURPOSE OF COPYING THIS WORK 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONSTRUCTION METHODS, PROCEDURES AND JOB SITE OR REVISING SAID DRAWING SHALL BE CONSIDERED A VIOLATION OF • REHABILITATION SUBCODE (NJAC 5:23-6) CONDITIONS INCLUDING SAFETY. CONSTRUCTION SHALL BE PERFORMED IN SUCH A MANNER TO PROTECT BOTH THE PROFESSIONAL CODE OF NJUCC, SUBCHAPTER 6 (CURRENT AS OF 03/06/2023) WORKMEN, OCCUPANTS AND THE PUBLIC FROM INJURY AND ADJOINING PROPERTY SHALL BE PROTECTED FROM ETHICS AND A THEFT OF COMPANY

Page 17

ETHICS AND A THEFT OF COMPANY ASSETS, BOTH OF WHICH SHALL BE • ONE- AND TWO-FAMILY DWELLING SUBCODE (NJAC 5:23-3.21) DAMAGE BY USE OF SCAFFOLDING, UNDERPINNING OR OTHER APPROVED METHOD. THE CONTRACTOR SHALL PROSECUTED TO THE FULLEST EXTENT OF THE LAW AND CURRENT INTERNATIONAL RESIDENTIAL CODE/2021, NJ Ed. REPAIR ANY AND ALL DAMAGE CAUSED DURING OR RESULTING FROM HIS OPERATIONS IN KIND TO THE STATUTES. • BUILDING SUBCODE (NJAC 5:23-3.14) SATISFACTION OF THE OWNER AT NO ADDITIONAL COST TO THE OWNER. Consultant: Aaron Gonzales, PhD 5 INTERNATIONAL BUILDING CODE 2021, NJ Ed. • PLUMBING SUBCODE (NJAC 5:23-3.15) 5. THE CONTRACTOR SHALL MAINTAIN THE JOB SITE IN A CLEAN, DEBRIS FREE CONDITION. THE DUST RESULTING

Page 17

5. THE CONTRACTOR SHALL MAINTAIN THE JOB SITE IN A CLEAN, DEBRIS FREE CONDITION. THE DUST RESULTING NATIONAL STANDARD PLUBMING CODE 2021 NJ Ed. FROM REMOVALS SHALL BE CONTROLLED SO AS TO PREVENT ITS SPREAD TO OCCUPIED PORTIONS OF THE • ELECTRICAL SUBCODE (NJAC 5:23-3.16) BUILDING AND TO AVOID CREATION OF A NUISANCE IN THE SURROUNDING AREA. NATIONAL ELECTRICAL CODE (NFPA 70) 2020 • ENERGY SUBCODE (NJAC 5:23-3.18) 6. CONTRACTOR SHALL SECURE ALL REQUIRED PERMITS, APPROVALS, ETC. PRIOR TO COMMENCING WORK AND INTERNATIONAL ENERGY CONSERVATION CODE 2021 (LOW-RISE RESIDENTIAL) SHALL SECURE CERTIFICATE OF OCCUPANCY UPON COMPLETION OF WORK. ASHRAE 90.1-2019 • MECHANICAL SUBCODE (NJAC 5:23-3.20) 7. CONTRACTOR SHALL BE RESPONSIBLE TO DISPOSE OF ALL DEMOLISHED MATERIAL OFF SITE IN AN APPROVED INTERNATIONAL MECHANICAL CODE 2021 MANNER. THE OWNER SHALL BE CONSULTED PRIOR TO DISPOSAL OF ANY SALVAGED OR EXCESS MATERIALS AT • FUEL GAS SUBCODE (NJAC 5:23-3.22)

Page 17

AGED OR EXCESS MATERIALS AT • FUEL GAS SUBCODE (NJAC 5:23-3.22) THE COMPLETION OF THE PROJECT. INTERNATIONAL FUEL GAS CODE 2021 8.UPON COMPLETION OF WORK, ALL EXCESS MATERIAL, DEBRIS, ETC. SHALL BE REMOVED AND THE WORK AREA POSTING PLACARD SHALL BE LEFT CLEAN TO THE OWNER'S SATISFACTION. REV. # VICINITY MAP BUILDING CODE INTERNATIONAL RESIDENTIAL - NJ Ed. 2021 PROPOSED ADDITION VOLUME 9. ALL WORK SHALL BE SCHEDULED IN COMPLIANCE WITH THE OWNER'S REQUIREMENTS FOR THE USE OF THE EXISTING FACILITY. BASEMENT LEVEL = 1,501 CUFT CONSTRUCTION TYPE WOOD FRAME "V-B" LEVEL 1 BATH/CLOSET = 1,600 CUFT 10. CONTRACTOR SHALL FURNISH ALL EQUIPMENT THAT MAY BE REQUIRED TO PERFORM THE WORK INDICATED IN A USE GROUP

Page 17

HAT MAY BE REQUIRED TO PERFORM THE WORK INDICATED IN A USE GROUP RESIDENTIAL "R5 RESIDENTIAL" SAFE AND ORDERLY MANNER. 4 PROJECT LOCATION TOTAL = 3,101 CUFT AREA OF RESIDENCE BASEMENT/GARAGE FLOOR = 1,080 SF 11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE RELOCATION AND TEMPORARY SUPPORT OF AND UTILITIES EXISTING 1ST FLOOR = 1,345 SF ENCOUNTERED DURING THE COURSE OF HIS WORK AND TO ENSURE THE OWNER'S FACILITY TO BE OPERATIONAL. EXISTING 2ND FLOOR = 1,080 SF 12. THE CONTRACTOR SHALL REVIEW DRAWINGS AND FIELD VERIFY ALL DIMENSIONS, CONDITIONS AND ELEVATIONS PROPOSED BASEMENT ADDITION = 202 SF PRIOR TO COMMENCING WORK. THE CONTRACTOR SHALL REPORT ANY DISCREPANCIES AND ADDRESS ALL PROPOSED BATH / CLOSET ADD. = 202 SF QUESTIONS TO ARCHITECT OR ENGINEER PRIOR TO COMMENCING WORK. 13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL REQUIRED CUTTING, PATCHING, FILLING AND CLEANING

Page 17

13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL REQUIRED CUTTING, PATCHING, FILLING AND CLEANING BUILDING MAX HEIGHT 26'-0" FROM AVERAGE GRADE PLANE TO MEAN ROOF HEIGHT UPON COMPLETION OF WORK. DESIGN LOADS BASEMENT = SLAB ON GRADE 14. THE CONTRACTOR SHALL NOT SCALE DRAWINGS FOR DIMENSIONS. ALL WRITTEN OR DIMENSIONED 1ST FLOOR = 15 PSF (DL) + 40 PSF (LL) INFORMATION TAKES PRECEDENCE OVER THE DRAWING. WEST ORANGE , NJ 07072 ROOF = 15 PSF (DL) + 30 PSF (SNOW LOAD) 15. THE CONTRACTOR SHALL SUBMIT, WHERE REQUIRED, SHOP DRAWINGS TO THE ARCHITECT FOR APPROVAL PRIOR TO THE START OF FABRICATION OF THOSE ITEMS. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.

Page 17

INFORMATION. DRAWING LIST T-100 TITLE PAGE 16. THE CONTRACTOR SHALL PROVIDE THE OWNER AND ARCHITECT WITH CERTIFICATES OF INSURANCE PRIOR TO BLOCK 175.24, LOT 3 G-100 GENERAL NOTES STARTING THE WORK. RHODE RESIDENCE 3 G-101 PLUMBING RISER, ENERGY CALCULATION S-100 SURVEY / SITE PLAN 17. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SHORING AND BRACING OF EXISTING STRUCTURES AS NEEDED PROPOSED RESIDENTIAL ADDITION

Page 17

PROPOSED RESIDENTIAL ADDITION 13 PORTER ROAD A-100 BASEMENT LEVEL PLAN - PROPOSED TO COMPLETE THE NEW WORK. A-101 FIRST FLOOR PLAN - PROPOSED A-102 ROOF PLAN AND DETAILS 18. ALL MANUFACTURER'S MATERIALS, COMPONENTS, FASTENERS, ASSEMBLIES, ETC. SHALL BE HANDLED AND A-200 ELEVATIONS, PAGE 1 INSTALLED IN ACCORDANCE TO WITH MANUFACTURERS INSTRUCTIONS AND RECOMMENDATIONS. WHERE BRAND A-201 ELEVATIONS, PAGE 2, TYPICAL WALL SECTION NAMES AND MANUFACTURED PRODUCTS ARE CALLED FOR, APPROVED EQUALS WHICH MEET APPLICABLE A-202 BUILDING SECTIONS AND DETAILS STANDARDS AND SPECIFICATIONS MAY BE SUBSTITUTED WITH WRITTEN PERMISSION OF THE ARCHITECT OR ENGINEER, AND THE OWNER. WHENEVER BRAND NAMES OR SPECIFIC PRODUCT SYSTEMS ARE

Page 17

ENGINEER, AND THE OWNER. WHENEVER BRAND NAMES OR SPECIFIC PRODUCT SYSTEMS ARE INDICATED IT SHALL SCOPE OF WORK BE CLEARLY UNDERSTOOD THAT SUCH IDENTIFICATION IS FOR THE PURPOSE OF ILLUSTRATING THE TYPE OF PRODUCT AND DEGREE OF QUALITY DESIRED. SUCH IDENTIFICATION IN NO WAY PRECLUDES THE CONTRACTOR BELOW IS A LIST OF ITEMS IN THE PROJECT BUT SHALL NOT BE LIMITED BY IT. THIS IS A LIST TO FROM USING PRODUCTS OF OTHER MANUFACTURERS WHICH CAN BE SHOWN IN ADVANCE TO BE OF LIKE AND OF ASSIST THE BIDDERS AND BUILDING DEPARTMENT TO UNDERSTAND THE SCOPE: EQUAL QUALITY. FOUNDATION SCOPE OF WORK: 19. ALL CHANGES SHALL BE REQUESTED IN WRITING AND MAY ONLY BE APPROVED IN WRITING BY THE ARCHITECT 1. NEW FOUNDATION AT BASEMENT LEVEL TO EXTEND GARAGE FOR STORAGE. OR ENGINEER AND THE OWNER PRIOR TO ANY CHANGES BEING MADE. 5/19/2026 4:24:58 PM LEVEL 1 SCOPE OF WORK: 20. THE ARCHITECT HAS THE RIGHT TO REJECT ANY PORTION OF WORK THAT IS POORLY INSTALLED, DOES NOT 1. SHORE UP AND

Page 17

HAS THE RIGHT TO REJECT ANY PORTION OF WORK THAT IS POORLY INSTALLED, DOES NOT 1. SHORE UP AND AND PREPARE FOR DEMO OF EXISTING EXTERIOR BASEMENT WALL AS INDICATED MEET INDUSTRY STANDARD, UNAUTHORIZED, OR WORK DONE CONTRARY TO THE INTENT OF THE CONTRACT ON THE FLOOR PLAN DRAWING. DOCUMENTS. SUCH WORK SHALL BE REPLACED, REPAIRED OR REMOVED AT THE CONTRACTOR'S EXPENSE. 2. DEMO EXISTING NORTH WALL IN EXISTING BEDROOM AND PREPARE FOR NEW BATH/CLOSET ADDITION, 2 REFER TO DRAWINGS. 21. THE CONTRACTOR SHALL GUARANTEE ALL HIS WORK AND THE WORK OF HIS SUBCONTRACTORS FOR A PERIOD 3. ADD NEW 2x6 STUD WALLS, WINDOWS AND (2) INTERIOR DOORS AS INDICATED ON DRAWINGS. ONE YEAR AFTER RECEIVING FINAL ACCEPTANCE AND DO ALL REPAIR WORK AND REPLACEMENT AS NECESSARY 4. NEW SIDING AND ASPHALT SHINGLE ROOF, SOFFITS, GUTTERS & LEADERS. DURING THAT PERIOD AT THE CONTRACTOR'S EXPENSE. 5. NEW BATHROOM FIXTURES ZONING WORKSHEET 22. IN NO EVENT SHALL STRUCTURAL MEMBERS BE CUT OR DRILLED WITHOUT THE WRITTEN APPROVAL OF A