Supporting Documentation · Sep 17, 2026
13 Porter Rd Application package Updated
4d3b3d34820ac3ef19b8e247e6ff8cc9c5d79d24da21af20864ec116cde405b6Indexed text
2. ALL DIMENSIONS TO BE VERIFIED IN FIELD. 2'-4" 10'-0" 2'-4" 3. FINAL STRUCTURAL DESIGN TO BE REVIEWED AND APPROVED BY LICENSED NEW EX. FAN 14'-7 1/2" STRUCTURAL ENGINEER. VENT THRU STORAGE
STORAGE 4. ALL SIMPSON STRONG-TIES TO BE INSTALLED FLUSHED WITH FLOOR JOISTS LAUNDRY UNLESS OTHERWISE NOTED. BATH 5. FINAL UTILITY EQUIPMENT CONFIGURATION, PLUMBING, DUCT, ELECTRICAL,
ETC., LOCATIONS TO BE DETERMINED BY CONTRACTOR AND THE OWNER. ALL DRAWINGS AND WRITTEN MATERIALS APPEARING HEREIN SISTER EXIST. 6. LOCATE HVAC GRILLS AND DIFFUSERS ON CENTER OF WINDOW, DOOR, CONSTITUTE ORIGINAL AND
UNPUBLISHED WORK OF THE JOIST W/ MINOR OPENING OR ROOM. COORDINATE WITH HVAC CONTRACTOR. ARCHITECT. THE REPRODUCTION CRACK (V.I.F.) OF THIS DRAWING FOR THE 7. INSTALL BLANKET INSULATION IN WALL CAVITY AROUND ALL. PURPOSE OF COPYING THIS
7. INSTALL BLANKET INSULATION IN WALL CAVITY AROUND ALL. PURPOSE OF COPYING THIS WORK OR REVISING SAID DRAWING SHALL MECH. CONTRACTOR TO LEVEL BE CONSIDERED A VIOLATION OF EXIST. CONC. SLAB W/ BOTH THE PROFESSIONAL CODE OF
BOTH THE PROFESSIONAL CODE OF ETHICS AND A THEFT OF COMPANY SELF-LEVELING UNDERLAYMENT ASSETS, BOTH OF WHICH SHALL BE FINISH W/ EPOXY SHIELD PROSECUTED TO THE FULLEST
EXTENT OF THE LAW AND CURRENT ENTIRE GARAGE FLOOR 2x10 FLOOR JOIST @ 16" O.C. STATUTES. MATCH FLOOR FRAMING HGT.
Consultant: Aaron Gonzales, PhD 5 OF EXISTING RESIDENCE 28'-11" NO CHANGES IN THE HATCHED AREA FIRST FLOOR
0" FINISH BASEMENT WATERPROOFING VAPOR BARRIER, 4' ELECTRIC 1/2" GYP. BD.
1/2" GYP. BD. CEILING 10 MIL. MIN. BASEBOARD FULL HEIGHT HEATER. EXACT NEW BASEMENT LOCATIONS TO WALL BE VERIFIED W/ OWNER &
File revisions (1)
- Sep 29, 2026
4d3b3d34820a16,037,124 bytes