3 - Mr. McPherson notes that the stormwater retention provision was discussed with the Board engineer during the SPRAB meeting held on June 9 - The architect and engineer, Mike Petry, entered on the record; he was sworn under oath. He testified to the following: - Mr. Petry begins his presentation with Exhibit A1 Colorized Site Plan. - Mr. Petry explains that the property contains a total of 8.3 acres, with approximately 1,070 feet of frontage along Prospect Avenue and another 166 feet of frontage along Woodland Avenue. - The subject property and the hotel parcel to its right are both located in the B2 Zone. - Mr. Petry explains that the properties to the rear, along Seaman Road and Deerfield Drive, are in the R6 Zone. - Mr. Petry emphasizes that the hotel property contains an easement providing 124 parking spaces for the exclusive use of the restaurant and catering facility. ○ He explains that this easement was established as part of the approvals for the hotel decades ago. - Mr. Petry states that he has worked with the Knowles family on this property and their other properties since 1985. - During that time, he has prepared all of the site plans for both the restaurant and catering facility and the hotel. - Mr. Petry explains that he was involved in the 1993 application process when the subdivision separating the two uses was developed. - Mr. Petry also describes his involvement with the two-phase renovation of the Manor. - He developed the concept plans and final plans and worked with Harry Knowles, his sons Kurt Sr. and Wade, and two of his grandchildren, Kurt Jr. and Carrie, on the build-out of the improvements. - Mr. Petry explains that the first phase of the renovation, which included the installation of the first elevator serving the facility as well as the first-floor lobby and lounge areas, was approved by the Technical Review Committee in 2012. - Mr. Petry states that the last full Planning Board application was in 2013 for the second phase of the renovation. - That phase included a rooftop addition containing a small banquet room on the second floor that overlooked the gardens in front of the property, Prospect Avenue, and the reservation. - Mr. Petry explains that the 2013 approval also included a second phase that has not yet been implemented but was reviewed and approved by the Board. ○ That portion involved changing part of the carriage house

Page 3

y explains that the 2013 approval also included a second phase that has not yet been implemented but was reviewed and approved by the Board. ○ That portion involved changing part of the carriage house from residential use to serve the à la carte dining area on the first floor. - Mr. Petry notes that the more current approvals for the space reference a 1996 Planning Board approval, which limited the restaurant and banquet facility to a maximum occupancy of 1,404 people and provided for a total of 434 parking spaces. ○ Of those 434 spaces, 124 spaces are part of the easement located on the hotel property. - Mr. Petry explains that in May 2025, the applicant appeared before the Board with the first phase of the renovation plan for the Estate. - That phase included renovation of the front portion of the building, generally from the entrance toward the east. - Mr. Petry says the 2025 work also included renovation of the front courtyard where the fountains are located, renovation of the front parking lot, and changes to the two driveways.

File revisions (1)