FINISH ( SMOOTH OR nailed 7 in. oc with 6d cement AS PLYWOOD LESS THAN 24" EXT. WALL TEXTURED) coated nails 1 7/8 in. long . 0.0915 TO GRADE Drawn By: AJG Checked By: FC3 TYPICAL 3"x3"x9/16" BEARING PLATE in. shank dia. and 15/64 in. dia. IS TO BE PRESSURE TREATED

Page 5

2"x6" P.T.. SILL PLATE BP BEARING heads. When used in widths other than 48 in. gypsum PLATE DETAIL SHEAR WALL HOLD DOWN STUCCO DTL. Simpson Strong-Tie N.T.S. @ GIRDER 5 N.T.S. BLOCKING DETAIL

Page 5

BLOCKING DETAIL panels are be installed horizontally. A-100 26-052 A-100 N.T.S. N.T.S. FRAMING DETAILS 1 2

Page 5

As indicated 26-052 08-31-2026 3/8" = 1'-0" © F E D C B A

Page 6

ARCHITECT OF RECORD: FC3 ARCHITECTURE+DESIGN, LLC NJ CERT. OF AUTHORIZ. #AC-58100 STRUCTURAL NOTE: 1. DO ALL NECESSARY CUTTING, BLOCKING, SHORING AND TEMPORARY SUPPORT OF ALL EXSITING FLOOR JOISTS, CEILING JOISTS AND ROOF CONSTRUCTION AS REQUIRED, PRIOR TO THE REMOVAL OF ANY LOAD-

Page 6

IRED, PRIOR TO THE REMOVAL OF ANY LOAD- EXIST. 6'-0" HIGH FENCE BEARING WALLS OR BEAMS. FRANK CUNHA III, AIA, NCARB (TYP., NO CHANGES) REGISTERED ARCHITECT NEW JERSEY #16411 BATHROOM NOTES (TYPICAL): FC3 PROJECT NO. 26-NJ-052 6 1. PROVIDE SOLID BLOCKING FOR THE INSTALLATION OF ALL MEDICINE BACKYARD AREA CABINETS, TOWEL RACKS,

Page 6

CABINETS, TOWEL RACKS, GRAB BARS, ACCESSORIES, ETC. 2. ALL PLUMBING FIXTURES TO BE SELECTED BY OWNER AND INSTALLED BY GENERAL CONTRACTOR OR PLUMBER. 3. INSTALL MARBLE OR CERAMIC TILE FLOOR SELECTED BY OWNER, OVER THIN SET WITH 4" HIGH, COVED TILE BASE. 4. INSTALL MARBLE OR CERAMIC TILE, SELECTED BY OWNER, ON WALLS OF SHOWER AREA IN BATHROOM, AS DIRECTED BY OWNER, PROVIDE

Page 6

OF SHOWER AREA IN BATHROOM, AS DIRECTED BY OWNER, PROVIDE SHAMPOO NICHE IN WALL WHERE DIRECTED BY OWNER. (OPTIONAL MARBLE OR CERAMIC TILE ON DROPPED CEILING ABOVE SHOWER, TO BE DETERMINED). ALL DRAWINGS AND WRITTEN MATERIALS APPEARING HEREIN CONSTITUTE ORIGINAL AND

Page 6

UNPUBLISHED WORK OF THE LOCATION OF EXIST. NOTE TO ELECTRICAL CONTRACTOR: ARCHITECT. THE REPRODUCTION DOWNSPOUT (NO CHANGES) INSTALL HEATED FLOOR PAD OVER PLYWOOD SUB-FLOORING. PROPOSED FIRST LEVEL EGRESS WINDOW NOTE: OF THIS DRAWING FOR THE PURPOSE OF COPYING THIS WORK

Page 6

PURPOSE OF COPYING THIS WORK OR REVISING SAID DRAWING SHALL SQUARE FOOT: BE CONSIDERED A VIOLATION OF BOTH THE PROFESSIONAL CODE OF ETHICS AND A THEFT OF COMPANY 2x6 STUD WALLS 1. 22'-3" x 9'-0" = 200 S.F. 1. CONTRACTOR SHALL VERIFY MIN. EGRESS WINDOW REQUIREMENTS ARE ASSETS, BOTH OF WHICH SHALL BE W/ R-19 BATT