Drawn By: AJG Checked By: FC3 S-100 26-052 S-100 1 26-052 08-31-2026 © F E D C B A

Page 4

ARCHITECT OF RECORD: FC3 ARCHITECTURE+DESIGN, LLC NJ CERT. OF AUTHORIZ. #AC-58100 22'-3" REMOVE EXISTING BATH WINDOW. FILL W/ STUDS & OUTDOOR CRAWL SPACE FINISH W/ GYP. PAVED AREA FRANK CUNHA III, AIA, NCARB BD., PAINTED (NO CHANGES) REGISTERED ARCHITECT

Page 4

REGISTERED ARCHITECT NEW JERSEY #16411 REMOVE 11'-0" OF REMOVE EXIST. EXISTING EXTERIOR DN WINDOWS. PREP FC3 PROJECT NO. 26-NJ-052 BASEMENT WALL KITCHEN FOR NEW ADDITION 6 11'-0" BATH LAUNDRY BATH DINING

Page 4

DINING 13'-5" ALL DRAWINGS AND WRITTEN BEDROOM MATERIALS APPEARING HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED WORK OF THE ARCHITECT. THE REPRODUCTION

Page 4

ARCHITECT. THE REPRODUCTION OF THIS DRAWING FOR THE MECH. PURPOSE OF COPYING THIS WORK HALLWAY OR REVISING SAID DRAWING SHALL BE CONSIDERED A VIOLATION OF BOTH THE PROFESSIONAL CODE OF

Page 4

ETHICS AND A THEFT OF COMPANY ASSETS, BOTH OF WHICH SHALL BE PROSECUTED TO THE FULLEST GARAGE EXTENT OF THE LAW AND CURRENT STATUTES. 28'-11" 2'-8 1/2"

Page 4

2'-8 1/2" Consultant: Aaron Gonzales, PhD 5 REMOVE EXIST. CLOSET WALL SITTING DN CRAWL SPACE FINISH BASEMENT REMOVE EXIST. LIVING ROOM CLOSET DOOR.

Page 4

REPAIR W/ STUD FRAME, 1/2" GYP. BD. PAINTED. 12'-10" BEDROOM UP REV. # DN 3'-6" 8'-2" 3'-7" 4

Page 4

3'-6" 8'-2" 3'-7" 4 15'-3" 14'-0 1/2" 25'-1" N N BASEMENT -DEMO FIRST FLOOR - DEMO 1 2 1/4" = 1'-0" 1/4" = 1'-0" STRUCTURAL NOTE: GENERAL DEMOLITION NOTES: WEST ORANGE , NJ 07072 1. DO ALL NECESSARY CUTTING, BLOCKING, SHORING AND TEMPORARY 1. THE DEMOLITION WORK SHOWN ON

Page 4

1. DO ALL NECESSARY CUTTING, BLOCKING, SHORING AND TEMPORARY 1. THE DEMOLITION WORK SHOWN ON THIS PLAN IS INTENDED TO BE A SUPPORT OF ALL EXSITING FLOOR JOISTS, CEILING JOISTS AND ROOF GENERAL OVERVIEW OF MAJOR DEMOLITION WORK REQUIRED AND IS NOT A CONSTRUCTION AS REQUIRED, PRIOR TO THE REMOVAL OF ANY LOAD- COMPLETE AND EXCLUSIVE REPRESENTATION OF ALL DEMOLITION WORK BEARING WALLS OR BEAMS. NEEDED FOR EXECUTION OF THE PROJECT. CONTRACTORS MUST VISIT AND REFER TO THE FULL SET OF CONSTRUCTION DOCUMENTS FOR ALL ITEMS WHICH MUST BE REMOVED AND/OR RELOCATED AS PART OF THE WORK. BLOCK 175.24, LOT 3 2. ALL EXISTING EQUIMENT TO REMAIN SHALL BE PROTECTED DURING