Supporting Documentation · Sep 17, 2026

13 Porter Site Plan Updated rcd 9 1 2026

Preserved file SHA-256a7ea227b5d4555256863aac631ac21a39f36c64ef9e9ecd06a4ffba16a6cc40d

Indexed text

Page 5

MATCH FLOOR FRAMING HGT. Consultant: Aaron Gonzales, PhD 5 OF EXISTING RESIDENCE 28'-11" NO CHANGES IN THE HATCHED AREA

Page 5

FIRST FLOOR 0" FINISH BASEMENT WATERPROOFING VAPOR BARRIER, 4'

Page 5

VAPOR BARRIER, 4' ELECTRIC 1/2" GYP. BD. CEILING 10 MIL. MIN. BASEBOARD FULL HEIGHT HEATER. EXACT NEW BASEMENT LOCATIONS TO

Page 5

WALL BE VERIFIED W/ OWNER & ELECTRICIAN 7'-5" 7'-4" GARAGE 12" CMU FOUNDATION WALL

Page 5

12" CMU FOUNDATION WALL SMOOTH PARGE FINISH. REV. # SITS ON A 2'x1' CONT. CONC.

Page 5

4'-6" FOOTING (MIN. 3500PSI) W/ (2) #4 REBAR HORIZ. 8'-8" BELOW GRADE.

Page 5

8'-8" BELOW GRADE. 5" CONC. SLAB (MIN. 3500 PSI) W/ 6x6 WWF NEW 10' x 7' GARAGE DOOR FIN. FLR. SELECTED BY OWNER BASEMENT -8'-3"

Page 5

-8'-3" 1'-0" 4 10'-2" 1'-6" 2'-0" 4" DIA. PERF. PVC FOUNDATION

Page 5

FOUNDATION DRAIN TO WATER DISPOSAL SYSTEM. W/ CRUSHED STONE N BASEMENT CROSS SECTION

Page 5

N BASEMENT CROSS SECTION LARGER THAN PIPE PERFORATION. ALL PERIMETER 3 OF NEW BASEMENT

File revisions (1)