LUMN ROUTED TO THE ROOFTOP MECHANICAL UNITS, WITH A POINT OF CONNECTION WITHIN THE SPACE FOR INTERIOR TENANT FIXTURE HOOKUP. # &! )* # &" 6 LANDLORD SHALL FURNISH AND INSTALL A $ 10 ( SEPARATELY METERED AND INSULATED 2” DEDICATED DOMESTIC COPPER WATER SUPPLY LINE SUPPLYING A MINIMUM OF 55 PSI AFTER ALL 1 # &" METERING AND BACK FLOW DEVICES. LANDLORD # &"

Page 29

METERING AND BACK FLOW DEVICES. LANDLORD # &" # & ! ! 8 4 SHALL FURNISH AND INSTALL A BOOSTER PUMP IF # &! # &" 7 THE PRESSURE IS UNABLE TO BE MET. LANDLORD " &# % 9 SHALL FURNISH AND INSTALL A SUB-METER # &! 5' AND CODE REQUIRED BACKFLOW PREVENTOR # &! # &" ( "# IN THE SPACE COORDINATED WITH CAVA’S CONSTRUCTION DOCUMENTS PRIOR TO THE POINT " " " " 6 OF CONNECTION. # &" # &"

Page 29

6 OF CONNECTION. # &" # &" 7 LANDLORD SHALL FURNISH AND INSTALL A 4” !& ! ! &" $% ! SANITARY LINE WITH A MINIMUM INVERT OF 48” INVERT ELEVATION AT THE POINT OF CONNECTION. 8 LANDLORD SHALL INSTALL WITH GREASE INTERCEPTOR WITH A MINIMUM CAPACITY OF 2,500 GALLONS OR SUFFICIENT TO MEET LOCAL CODE FOR TENANT’S EXCLUSIVE USE WITH INVERT ELEVATION AS NECESSARY TO ACCOMMODATE GREASE INTERCEPTOR INSTALLATION REQUIREMENTS OF TENANT. THE GREASE INTERCEPTOR INSTALLATION SHALL BE A

Page 29

E INTERCEPTOR INSTALLATION SHALL BE A MINIMUM OF 25-FEET AWAY FROM TENANT’S MAIN ENTRY DOORS AND PATIO SEATING. 9 CAVA SHALL PROVIDE AND INSTALL TWO (2) TWO-INCH (2”) EMPTY RIGID CONDUIT WITH PULL STRING (1) FROM THE PROPERTY’S TELEPHONE POINT OF DEMARCATION TO A LOCATION PER PLANS AND STUBBED WITHIN THE LEASED PREMISES AND (2) TO A LOCATION TO THE ROOF PER NOT TO SCALE LANDLORD’S PLANS. CAVA SHALL COORDIANTE ROUTING TO/FROM CAVA SPACE WITH THE LANDLORD. 10

Page 29

LANDLORD. 10 LANDLORD SHALL FURNISH AND INSTALL A 4” GREASE LINE WITH A MINIMUM INVERT OF 48” INVERT ELEVATION AT THE POINT OF CONNECTION. CAVA WEST ORANGE, NJ PV PACKAGE 06.08.26

Page 30

MEP EXHIBIT WORK LETTER TYPE: ( ( ( * ( 2 2 9: 3 * * * ) EX. 0 2 3 2 *3 2 *3 256 7 8 3 2* 3 * 3 2 9: 3 2* 3 2* 3 2 9: 3 ( 2 43 * * ( ( * * * + * ( 1 + #' #$ ' $$ "$ $! "' ! ! %' $ % %# '$ # $ # ' $$ !$ ' $ #$! " $ ! * * #* * *(

Page 30

$ # ' $$ !$ ' $ #$! " $ ! * * #* * *( *0 * * + * ! , - * ) # %' # %' "$$$ !$ $! $' $ %% " %# !$ ! ' % # ' $$ $ '" $ #$! " $ ! # * " * ) * # *

Page 30

# * ( KEY:+ *0 * * + * ! , - * * LANDLORD SHALL FURNISH AND INSTALL AT A # * 1 LOCATION PER TENANT’S PLANS A NEW FULLY * * FUNCTIONAL RTU. CAVA SHALL PAY ALL COSTS

Page 30

* FUNCTIONAL RTU. CAVA SHALL PAY ALL COSTS ( ASSOCIATED WITH THE RTU UNDER ONE TON PER 250 SQUARE FEET. THE LANDLORD SHALL INSTALL ' * THE * RTUS IN LOCATION SHOWN, SIZED AND * PROVIDED WITH ACCESSORIES AS INDICATED IN

Page 30

PROVIDED WITH ACCESSORIES AS INDICATED IN * RTU SCHEDULE AS PERMITTED BY LOCAL AHJ. * * CAVA SHALL BE PERMITTED TO FURNISH AND % * 2 INSTALL DUCT THROUGH THE ROOF IN LOCATION ) + * * SHOWN FOR THE RESTROOM EXHAUST.