Supporting Documentation · Oct 7, 2026
Ltr Vite final requesting extension 81726
782582f0f4e89c7b9cf9e3639cac2392467c863281eb8d235cec7e7d78ff868bIndexed text · page 5
Show all pages10. 1. A commercial use is located on the adjacent lot to the north and New J lersey Transit’s Highland Avenue railroad station is located two blocks to the east and bus stops are located in the vicinity, The applicant proposes subdividing the existing parcel into two lots with the existing home remaining on Lot A and demolishing the existing garage and replacing the garage with a two-family dwelling above the existing foundation. The proposed two-family house on Lot B would have two bedrooms in each dwelling unit, along with one garage for each'unit. The garage for the proposed new two-family on Lot B would allow for two stacked cars, for a total of four off-street parking spaces on Lot B, Applicant proposed constriction of a paver parking area for two vehicles in the front of the existing dwelling on Lot A; however, the majority of the Board preferred that the property maintain the front hedge and lawn area which is aesthetically more pleasing and in keeping with the current neighborhood. The Board did nut foreclose a request inthe furure’for oi site puting ifi the front of the house on Lot A should conditions which currently are favorable for sufficient on street parking change. Dr. Carmine Allonardo, the property owner’s principal, testified that he bought the home trom his mother-in-law in December of 2021, cleaned up the existing house with new windows, siding and interior improvements such as new bathrooms and plumbing. Dr, Allonardo testified that the existing garage is falling apart and cannot be used.
File revisions (1)
- Sep 29, 2026
782582f0f4e8472,957 bytes