12 A more full plan set had just been submitted to the County to start its approval and review process. - Mr. Panullo stated that he believed Chairman Bagoff had asked that sidewalks be added on both sides of the driveway on the Crestmont side of Eagle Rock Avenue. Mr. Panullo asked whether that was correct. Mr. Pehnke confirmed that this was what Chairman Bagoff had requested. - Mr. Panullo asked whether the requested sidewalks were anticipated in the drawing currently displayed. Mr. Pehnke stated that they were not. - Mr. Panullo then asked whether adding the sidewalks would encroach on the existing Crestmont frontage. Mr. Pehnke explained that the sidewalks would fall within the area that had already been graded and was intended to be dedicated to the County. - Mr. Panullo asked whether, if the sidewalks were put into place, they would affect the relief sought in the application. He specifically referenced the depth of the slope and setbacks of improvements. Mr. Pehnke answered, no. - Mr. Panullo asked whether the design, crosswalks, and related elements were at the discretion of Essex County. Mr. Pehnke clarified that the intersection is under the jurisdiction of Essex County. - Mr. Panullo asked whether the traffic coming into the intersection from any direction, including ingress and egress from all four sides, is material to whatever is engineered from a design standpoint. He specifically referenced level of service, sacking, and other related considerations. Mr. Pehnke confirmed that it is all taken into consideration. - Mr. Panullo asked what changes, if any, would need to occur to Oval Road to accommodate the application. Mr. Pehnke stated that there would be no widening on Oval Road. He explained that there would be: ○ Regulatory signage ○ Updated striping ○ A stop bar associated with the signal rather than a stop sign ○ Removal of the stop sign ○ Pedestrian crosswalk striping. - Mr. Panullo asked whether a traffic study was done to determine how much traffic leaving Oval Road during peak times goes east, goes west, and goes south toward Route 280. Mr. Pehnke confirmed that a traffic study was done. - Mr. Panullo asked for the date of the study. Mr. Pehnke stated that the study submitted with the application is dated January 2026. - Mr. Panullo referred to the prior application across the street involving the Highlands and the application from

Page 12

r. Pehnke stated that the study submitted with the application is dated January 2026. - Mr. Panullo referred to the prior application across the street involving the Highlands and the application from Walter Lubanecki from 2018–2019. He stated that he believed the County would require another study for that side. Mr. Panullo asked Mr. Pehnke whether he agreed. Mr. Pehnke stated that the study had already been done and was documented within the January 2026 study he had referenced. - Mr. Panullo confirmed that the study referenced by Mr. Pehnke took into account all four sides, including traffic coming out of Oval Road. Mr. Pehnke confirmed that it did. - Mr. Panullo asked approximately how many feet it is from Oval Road turning right onto Eagle Rock Avenue to the Laurel Avenue traffic signal. Mr. Pehnke stated that it is roughly 800 to 900 feet. - Mr. Panullo asked how many cars leaving Oval Road head south. Mr. Pehnke initially stated that it depends on the time of day and was asked to reference the worst case. He explained that they had taken the opportunity to obtain a new traffic count before schools closed, at the beginning of June.

File revisions (1)