Show all pages23 - Mr. Cote stated that the new egress drive begins at the upper-level parking lot and progresses down to the new intersection with Oval Road. - The proposed egress roadway would be 24 feet wide and would provide two lanes, including left and right movements and a through movement, exiting onto Eagle Rock Avenue. - Mr. Cote then described the underlying parking area, which he referred to as the “lower level.” He explained that the lower-level parking lot is being modified and reconfigured to create a 64-space parking lot. - The lower-level parking lot will connect to the new egress drive while maintaining the existing connection to the upper-level parking lot along the south-central portion of the lower lot. - Mr. Cote stated that the lower-level lot will also include an area for water quality measures, including forest pavement, along the northern portion of the lot. - He explained that this area will tie into other water quality measures being provided for the site. - Mr. Cote noted that, for purposes of the variance, there is a location where a fence/guide rail is located less than 5 feet from a parking space. He explained that this configuration is based upon the previously approved modular structure that was built there to provide separation between the parking spaces and pedestrian movements to that building. He identified this as one element of the variance being requested. - Mr. Cote then discussed the eastern edge on the northern side of the site, where another detention basin is being proposed. He explained that, similar to the basin at the corner of Eagle Rock Avenue and Laurel Avenue, this detention basin will treat both water quality and water quantity for purposes of balancing stormwater and achieving compliance with the stormwater regulations. - Mr. Cote pointed out that, based on the combination of the two site plan sheets, the existing site currently has 256 parking spaces. He stated that the prior variance granted for the site was actually based on 252 spaces, but a physical count of the existing spaces yielded 256. - Mr. Cote explained that, based upon the 256 existing spaces, the application is adding 36 spaces. He stated that there are 32 physical spaces being added in total, representing the net between the revisions to the new parking lot and the reconfiguration of the lower lot. - Mr. Cote explained that four of the total spaces are
physical spaces being added in total, representing the net between the revisions to the new parking lot and the reconfiguration of the lower lot. - Mr. Cote explained that four of the total spaces are referred to as EV credits. For each EV space, there is a credit of one additional parking space that counts toward parking compliance, and those credits are part of the calculation. - Mr. Cote stated that, physically, there will be 288 parking spaces built when the additional spaces are completed. The additional four spaces included in the parking count for purposes of the variance request, bringing the total to 292, are EV credit spaces. - Mr. Schkolnick clarified that when they refer to a variance request, there is already an existing deficit and that the proposal is reducing the existing deficit. - Mr. Cote agreed and explained that the increase in parking spaces reduces the current relief previously granted for the site. He stated that the site is going from 252 spaces previously approved under a prior site plan variance, against the 700 spaces that the ordinance would require, to 292 spaces, thereby reducing the relief previously granted on the site. - Mr. Cote then discussed the roadway layouts, standard parking spaces, 24-foot drive aisles, and the configuration of the connection previously referenced. - Mr. Cote moved to the fire truck circulation plan and explained that the plans route emergency vehicles through the new features being added to the site to demonstrate that they can maneuver, access the various locations, and progress through the site.
File revisions (1)
- Oct 7, 2026
2e4c7c42a270337,233 bytes