Show all pages24 - On the westerly side, Mr. Cote showed the fire truck circulation through the new parking facility, based upon the dimensions of the West Orange ladder truck that had been provided for purposes of supporting the area. - Mr. Cote explained that there are a number of locations where the project is overcoming existing conditions and grades. He stated that one of the driving factors behind where the walls have been placed, and the reason for the walls, is to help minimize the number of trees removed. - To provide perspective on the elevations, Mr. Cote explained that if Eagle Rock Avenue is at approximately elevation 547 in the area he was pointing to, the upper parking lot is at approximately elevation 566. - Mr. Cote explained that the stormwater and grading associated with the project are designed to control all runoff from the site through a combination of the small-scale basins previously discussed, including one in the northwest corner and one at the east/northeast end of the site. - Mr. Cote stated that a swale is also being provided at the top of the wall to direct water rather than allowing it to sheet flow onto Eagle Rock Avenue. The water will progress into the system and into a controlled drainage conveyance system, including the piping network that conveys the flow from the site. - Mr. Cote stated that, as part of the discussion regarding safety on Eagle Rock Avenue, the stormwater on Eagle Rock Avenue was also evaluated. He explained that the existing system was found to be deficient and that the applicant is upgrading the system along Eagle Rock Avenue to accommodate the flows. - He stated that this will improve the drainage aspects of Eagle Rock Avenue by controlling the sheet flow that is uncontrolled today, as well as providing the flow reductions necessary to comply with the stormwater regulations. - Mr. Cote then discussed the second sheet on the east side of the site and again referenced the upper parking lot configuration to provide a sense of the elevations. - Mr. Cote stated that the upper lot ranges from approximately elevation 560 to 558 at the top end and then rises to approximately elevation 564 toward the top of the new exit driveway. - Mr. Cote explained that the new exit driveway begins at approximately elevation 564 and runs down toward Eagle Rock Avenue, which is approximately elevation 538. - Mr. Cote stated that, in order
ay. - Mr. Cote explained that the new exit driveway begins at approximately elevation 564 and runs down toward Eagle Rock Avenue, which is approximately elevation 538. - Mr. Cote stated that, in order to transition from elevation 564 to approximately 538 at Eagle Rock Avenue, the driveway needs to be at an 8.5% grade. - Mr. Cote further explained that, in addition to the 8.5% transition needed to reach Eagle Rock Avenue, walls are required to support the changes in grade, maintain the upper- level parking lot grades adjacent to the slope leading down to Eagle Rock Avenue, and allow for a stormwater basin to be constructed on the site. - Mr. Cote explained that the 21.5-foot wall occurs where the lower-level basin is located. He stated that the basin is at a level compatible with reaching street grade, dealing with the Eagle Rock Avenue discharges, supporting the upper-level parking, and creating the transition at the northern end. - Mr. Cote stated that the walls along Eagle Rock Avenue, resulting from the pullback of the grades previously referred to by Mr. Pehnke, will create an approximately 8- to 9- foot-high wall along Eagle Rock Avenue from the corner of Laurel Avenue and Eagle Rock Avenue to the new egress drive. - Mr. Cote then discussed the existing driveways. He stated that the existing driveway that had been referred to multiple times as the “acute angle driveway” is being removed in its entirety.
File revisions (1)
- Oct 7, 2026
2e4c7c42a270337,233 bytes