7 1 26 WO PB Draft Minutes

Preserved file SHA-2562e4c7c42a270498c0c3576e47d85bc4d985dc27f3a8f765c33c1de4f25d6b446

Indexed text · page 25

Show all pages
Page 25

25 - Mr. Cote explained that the slope conditions associated with that driveway will therefore be eliminated. However, the existing 10.5% drive connecting the lower-level and upper- level parking lots will remain. - Mr. Cote stated that the variance therefore also addresses the existing 10.5% driveway slope. He explained that the driveway is being slightly modified but will not be made steeper, in order to maintain the connection between the two parking lots. - Mr. Cote then discussed the area associated with both detention basins and their role in handling the parking lots and the new driveway. He moved to the drainage plan and discussed the small-scale bioretention basin. - Mr. Cote explained that the small-scale bioretention basin will provide water quality and water quantity reduction. Drains that previously allowed water to sheet flow off the site will be connected, with the goal of getting everything into pipes rather than allowing it to sheet flow over Eagle Rock Avenue. - Mr. Cote stated that this would help address potential icing conditions and similar safety concerns on Eagle Rock Avenue. - Mr. Cote explained that the eastern side of the site has a similar small-scale bioretention basin. One basin will be planted with woody vegetation, which will be part of the landscaping discussion. - Mr. Cote stated that the bioretention provides water quality treatment in conjunction with the porous pavement proposed in the parking lot. - Mr. Cote emphasized that the detention basins, porous pavement, and other measures have been tied together to achieve compliance with the current stormwater regulations. - Mr. Cote then moved to the tree count and tree removal and replacement and switched to the partial tree removal plan. - Mr. Cote explained that the partial tree removal plan identifies trees within the limit of disturbance that are being removed. Replacement calculations are based upon the town’s requirements and the diameters of the existing trees. - Mr. Cote stated that 313 trees are being removed. Based upon the replacement ratios required by the town ordinance, the project will replace those trees with a total of 486 trees. - Mr. Cote then modified that number by 11 trees. He explained that the plan had counted 11 trees toward compliance with the landscaping and parking lot requirements, and that the applicant would not take credit for those 11 trees as

Page 25

ber by 11 trees. He explained that the plan had counted 11 trees toward compliance with the landscaping and parking lot requirements, and that the applicant would not take credit for those 11 trees as replacement trees. - Mr. Cote stated that the applicant would therefore add 11 more trees, resulting in a total of 597 trees for purposes of the replacement tree count. - Mr. Schkolnick asked Mr. Cote what sheet he was on. Mr. Cote responded that he was on the partial tree removal plan, sheet LD101. - Mr. Schkolnick clarified that Mr. Cote was making an oral amendment to the application to comply with the review letter and add 11 additional trees because of the way the calculation had been done. - Mr. Cote confirmed this and explained that, based on the ratios, the count was 586, but the trees are being replaced in a combination of locations throughout the site. - Mr. Cote stated that there is a summary table on the plan identifying the 586 trees and their placement relative to areas where bulk improvements are being made, including along Eagle Rock Avenue and Laurel Avenue and in the parking areas being reconfigured. - Mr. Cote explained that additional trees will also be planted throughout the Crestmont property as a whole. He stated that 303 trees will be placed along the frontage area and an additional 239 trees will be placed on the overall Crestmont property.

File revisions (1)