Supporting Documentation · Oct 7, 2026
7 1 26 WO PB Draft Minutes
2e4c7c42a270498c0c3576e47d85bc4d985dc27f3a8f765c33c1de4f25d6b446Indexed text · page 26
Show all pages26 - Mr. Cote stated that, to reach the full count of 586, the applicant had proposed 44 trees off-site in coordination with the town forester. As a result of the oral amendment, the 44 off-site trees will become 55 trees in order to provide the additional 11 trees. - Mr. Cote then discussed where the trees are being removed based on the limits of disturbance of the property. - Mr. Cote addressed the question of why walls are being proposed in steep slope areas. He explained that, by using the wall configuration and grading proposed, the applicant has been able to minimize the number of trees that need to be removed. - Mr. Cote stated that if the walls along Eagle Rock Avenue or at the base elevation of the upper-level parking improvements and increased parking had been eliminated, additional trees that are currently outside the disturbance area would have had to be removed as a function of the grading. - Mr. Cote explained that the walls serve two purposes: to consolidate the development limits and minimize disturbance, and to eliminate the removal of additional trees. - Mr. Cote then moved to the planting plans and reviewed the easterly sheet. - Mr. Cote explained that, on the easterly portion of the site, trees being removed are associated with the areas of disturbance. Trees outside the limit of disturbance will be subject to tree protection measures consistent with the requirements of the town forester and the ordinance. - Mr. Cote then reviewed the planting plan and discussed the total number of trees being placed on the site as a whole. - Mr. Cote stated that the 303 trees proposed along the frontage area, which he described as the northerly portion where the predominant improvements are being proposed, will consist of a combination of different types of trees. - Mr. Cote stated that he would not discuss the specific species of trees because those are identified on the plans. He noted that substitutions will be made in accordance with the review comments received, and that the plan will be made consistent with those comments. - Mr. Cote explained that the replacement planting will include a combination of shade trees and ornamental trees. He also identified evergreen trees, shrubs including evergreen and deciduous shrubs, ornamental grasses, ground covers, and perennials as part of the planting program. - Mr. Cote described the planting program as
tified evergreen trees, shrubs including evergreen and deciduous shrubs, ornamental grasses, ground covers, and perennials as part of the planting program. - Mr. Cote described the planting program as substantial and stated that the small-scale bioretention basin will also be planted in compliance with DEP standards. - Mr. Cote stated that 40 trees will be planted within the bioretention basin. He explained that these trees will be “whips.” - Mr. Cote clarified that the 40 whip trees do not count toward the restoration calculation and are not being used to offset the trees removed and trees restored. However, he stated that they will grow into additional trees over time and should become a substantial feature of additional trees as they grow. - Mr. Cote described the existing trees along Eagle Rock Avenue as being in various conditions, with substantial scrub and other growth located on the embankment slope. - Mr. Cote stated that the applicant will clean up the area to create the streetscape area previously discussed. The walls will be imposed along the area to allow the grades to be pulled back. - Mr. Cote explained that, adjacent to Eagle Rock Avenue, there will be significant replacement planting in areas where trees were removed and will now be replaced by new trees.
File revisions (1)
- Oct 7, 2026
2e4c7c42a270337,233 bytes