Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Oct 7, 2026

7 1 26 WO PB Draft Minutes

Preserved file SHA-2562e4c7c42a270498c0c3576e47d85bc4d985dc27f3a8f765c33c1de4f25d6b446

Indexed text · page 5

Show all pages
Page 5

5 ○ Expansion of parking ○ Improvement of internal circulation ○ Relocation of the existing egress drive, which currently approaches Eagle Rock Avenue at an acute angle ○ Realignment of the egress drive opposite Oval Road ○ Improvement of the grading on the approach to Oval Road by flattening the approach in accordance with design standards ○ Widening Eagle Rock Avenue toward the project site to separate left-turn movements onto Oval Road from through movements, which Mr. Pehnke identified as providing a public safety benefit ○ Installation of a traffic signal that would control vehicular movements and provide full pedestrian crossings - Mr. Pehnke reported that, since the previous meeting, the applicant had an opportunity to participate in a pre-application meeting with Essex County. - Mr. Pehnke stated that the County agreed that the proposed improvement was appropriate for the location. He said the County liked the proposed traffic signal and believed that it was needed today. - Mr. Pehnke explained that the County identified pedestrian crossings in the area as challenging. - He stated that, over the last five years, the County had probably faced approximately 200 pedestrian incidents involving people crossing a road. ○ He said the County therefore viewed the signalization of this location as providing a positive benefit from a pedestrian safety standpoint. - Mr. Pehnke stated that the County also supported the relocation of the driveway and had actually suggested the relocation a few years ago. He explained that the relocation would: ○ Eliminate the acute angle of the existing driveway ○ Improve drainage, which currently flows down onto Eagle Rock Avenue - Mr. Pehnke identified two requests made by the County: ○ The applicant must remove the old pavement associated with the old driveway. Mr. Pehnke stated that the applicant had assured the County this would be done. ○ Equipment must be added to the Laurel Avenue intersection and the proposed intersection so that the two intersections are coordinated and “talked to each other.” Mr. Pehnke stated that this was already part of the design, as he had testified at the previous meeting. BOARD QUESTIONS - Ms. Kapferer asked him to review the proposed crosswalks and whether they would connect to any existing sidewalk. Mr. Pehnke explained that the sidewalk system ends near Wakeman Street. He stated that there was

Page 5

er asked him to review the proposed crosswalks and whether they would connect to any existing sidewalk. Mr. Pehnke explained that the sidewalk system ends near Wakeman Street. He stated that there was evidence of a path just to the west of that location. He explained that, in the area of the proposed signal, the signal would include: ○ Connecting sidewalks on the quadrants ○ Handicap ramps ○ Crosswalks themselves ○ A crossing specifically intended to provide a safe crossing of Eagle Rock Avenue. - Chairman Bagoff asked whether the applicant would have a sidewalk from Laurel Avenue down to the easterly aspect of the property. Mr. Pehnke stated that the applicant had not proposed a sidewalk in that section as part of the application.

File revisions (1)