16 - Mr. Cecini noted that the plans were somewhat old and that there had been comments from the planner. He stated that the architect was proposing lighting for the structure and that the applicant intended to provide the lighting as a condition to demonstrate compliance with the 0.5 foot-candle requirement. - Mr. Cecini then addressed parking, which he identified as the variance being sought. - Mr. Cecini stated that when the drawings were originally submitted, the applicant had assumed that the warehouse/storage space on the second floor could be excluded from the parking calculation because it was not intended for customers and was primarily for storing materials needed for the supermarket. - Mr. Cecini stated that the Planner requested that the second-floor space be included in the parking calculation. - Mr. Cecini stated that he therefore ran the parking calculation two different ways. Under the B1 calculation, including the second-floor storage area, the total square footage less 1,000 square feet, divided by 300, resulted in 56.92 spaces, which rounded up to 57 spaces. - Mr. Cecini stated that because the project proposed four EV spaces, the applicant received the benefit of adding four spaces to the design, bringing the required number down to 53 spaces. - Mr. Cecini stated that the plan currently provided 58 spaces, but there was no way to fit the additional five spaces within the proposed area. - Mr. Cecini stated that the second calculation considered how necessary the additional five spaces were by looking at the ordinances governing other parts of the city. - Under the second calculation, the 13,934-square-foot retail space divided by 300 resulted in 46.44 spaces. - The 3,144-square-foot storage space divided by the warehouse requirement of 600 resulted in 5.24 spaces, for a total of 52 spaces. After subtracting the four EV spaces, the calculation resulted in 48 stalls. - Mr. Cecini stated that, based on the two different calculations, a parking variance was required, but in his opinion the design should meet the requirement for the intended use of the property. - Mr. Cecini stated that there had also been discussion regarding turnarounds but that he would leave that issue to the traffic engineer because he had not performed a turnaround analysis. - Mr. Cecini stated that, in general, he considered the application a solid application that met

Page 16

t he would leave that issue to the traffic engineer because he had not performed a turnaround analysis. - Mr. Cecini stated that, in general, he considered the application a solid application that met the stormwater and lighting requirements and that the parking variance was related to the different type of building proposed compared with prior CVS, Walmart, and Walgreens uses at the site. - Ms. Wolfe asked whether Mr. Cecini would address landscaping. Mr. Cecini stated that it would be more appropriate for Jorge to address landscaping because the architect had the better presentation and 3D outputs. - Mr. Cecini stated that the landscaping was being coordinated with the architect and had been taken into consideration in the drainage design. - Ms. Wolfe asked whether the utilities remained the same. Mr. Cecini stated that they did. - Ms. Wolfe asked where the refuse area and dumpster would be located. Mr. Cecini stated that he believed the refuse area would be inside the building and that the architect had addressed it during his prior presentation. BOARD QUESTIONS

File revisions (1)