Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Oct 7, 2026

8 12 26 WO PB Draft Minutes

Preserved file SHA-25689b5155dfd6e8da1e2d6b434b7e2576700ca3fd8942c85eafcf06f348f3f3105

Indexed text · page 17

Show all pages
Page 17

17 - Chairman Bagoff asked whether there would be a bench for seniors to sit on while waiting for the jitney. Mr. Cecini stated that he believed there was a location for the bench and recalled that, after the prior meeting, the team had discussed it with the architect. He stated that the architect had a place for the bench and that it would not interfere with parking or other requirements. - Mr. Guarino asked Mr. Cecini about the water retention facility in front by the street and asked how many gallons it retained. Mr. Cecini reviewed the stormwater report and testified that the project has a runoff volume of approximately 7,800, with the exact number to be confirmed upon further review of his report. - Mr. Guarino asked whether, after the stormwater system reaches its maximum retention, the water would flow into the Township’s stormwater system. Mr. Cecini confirmed that it would. - Mr. Guarino asked whether the proposed drainage system would include new infrastructure or connections between the property and the Township facility. Mr. Cecini confirmed that the project intends to connect to existing or proposed manholes in the street. - Mr Guarino asked about the delivery trailer and the reference in the first presentation to parking the delivery trailer on Main Street. He stated that he had a significant concern with that arrangement. Mr. Cecini stated that he understood the concern and explained that he had performed turning-radius work, but that the traffic engineer would be the most appropriate person to address the reasoning for the proposed delivery arrangement. ○ Mr. Cecini stated that, within the site, it would not make sense to place the delivery trailer there because it would be very difficult to turn around and would require the truck to back in or back out. - Council president Scarpa asked if she could hear more about how the delivery truck issue would be mitigated. Mr. Cecini stated that someone who specializes in the matter was taking a very close look at it and that it would be appropriate for the traffic engineer to address it. - Mr. Klein asked whether sight triangles had been placed on the site plan for the site driveways, showing the distance that could be seen when exiting the driveway. Mr. Cecini initially referred to the directional arrows, but Mr. Klein clarified that he was asking about sight triangles. ○ Mr. Klein stated that he did

Page 17

that could be seen when exiting the driveway. Mr. Cecini initially referred to the directional arrows, but Mr. Klein clarified that he was asking about sight triangles. ○ Mr. Klein stated that he did not see the sight triangles on the site plan and noted that he was not sure whether the matter had been included as a comment in a prior review letter. ○ The architect, Mr. Jorge Mastropietro, stated that the sight triangles were included in the architectural drawings. The sight triangles were identified on Sheet 13. - Ms. Kapferer asked whether a geotechnical analysis had been performed. Mr. Cecini confirmed that it had. - Ms. Kapferer asked whether the stormwater design provided adequate separation between the stormwater features and the high groundwater table, and whether the percolation rates were adequate. Mr. Cecini confirmed both. - Ms. Kapferer asked about the proposed grocery store and neighboring properties, specifically whether nearby buildings have basements and whether infiltration facilities located near those buildings could create a concern. Mr. Cecini stated that most buildings are designed to have waterproofing up to the grade line as required by code. He noted that water tables fluctuate even without stormwater percolating into the area and stated that he did not have concerns about additional water entering basements. - Ms. Kapferer asked whether Mr. Cecini knew if the neighboring structures had basements. Mr. Cecini stated that he did not know.

File revisions (1)