Show all pages21 - Mr. Dean explained that the photograph showed a typical delivery occurring at the neighboring property, where the truck left insufficient width for traffic to safely pass. He stated that the applicant wanted to capitalize on the parallel parking availability along Main Street to create a temporary loading zone, which he said is frequently done in downtown areas. - Mr. Dean stated that the loading zone would be used for a limited duration, approximately 20 to 25 minutes, to allow a few pallets to be removed from the truck and brought into the store, after which the area would revert to available on-street parking. - Mr. Dean said that the proposed loading arrangement was considered a very practical solution that allowed the applicant to design a sufficient amount of parking for the project. - Mr. Dean explained that if trucks were required to make deliveries on the property, they would have to cross the sidewalk twice, once to enter the site and once to exit. He stated that, out of concern for providing the highest level of safety, the applicant did not want trucks crossing the sidewalk and conflicting with pedestrians. - Mr. Dean stated that, because Main Street is part of the Essex County roadway system, the proposal was reviewed with the County planner, who took no exception to the proposal in terms of safety, traffic, or movements and considered it a creative solution to a typical urban or downtown concern. - Mr. Dean reiterated that keeping trucks off the sidewalk and out of conflict with pedestrians was considered a very practical and safe design that would adequately serve the store, and that the proposal had also been vetted with the applicant. - Mr. Dean stated that he did not intend to get into the details of the traffic study, other than to identify it and discuss the comparison between the current site uses and the proposed use. - Mr. Dean acknowledged that a thriving new grocer on Main Street would likely be a more vibrant business than the current use, or than the uses that could occupy the two existing buildings if they were re-tenanted. - Regarding access and circulation, Mr. Dean explained that the proposed plan provides total on-site traffic flow, with parking essentially all the way around the site, head-in along the perimeter, and rows of parking in the central core to maximize the number of spaces. - Mr. Dean stated that one parking
ic flow, with parking essentially all the way around the site, head-in along the perimeter, and rows of parking in the central core to maximize the number of spaces. - Mr. Dean stated that one parking space had been lost due to the cart corral, which he believed was appropriate in response to a concern previously raised by a Board member. - Mr. Dean explained that the plan eliminated the need for individuals to back out of parking spaces and across the sidewalk. - Mr. Dean stated that the parking directly along the north side of the building would be head-in parking and would include two handicap/ADA spaces. The parking would wrap all the way around the parking field, maximizing the number of available spaces. - Mr. Dean stated that there were approximately a dozen interior traditional tandem spaces, all served by 24-foot-wide aisles that allow vehicles to exit from the perpendicular spaces. - Mr. Dean addressed the question of site triangles and stated that the applicant had endeavored to provide low-level landscaping at the exit, below 36 inches in driver height. He said that, if necessary, the landscaping plan could be amended to clarify that requirement. - Mr. Dean explained that there are no buildings or other obstructions affecting the site triangles. He noted that parallel parking spaces are the one feature that theoretically affects site triangles because vehicles parked on the street can be within the sight triangle,
File revisions (1)
- Oct 7, 2026
89b5155dfd6e370,634 bytes