Show all pages23 in an EV who is not disabled could park in the space without receiving a handicapped parking violation, provided that the space remains accessible to those individuals. - Ms. Amanda C. Wolfe asked Mr. Dean to address the parking calculation and whether he concurred that the project provided sufficient parking. - Mr. Dean stated that there had been discussion with the TRC regarding the parking calculation. He explained that the mezzanine area is not customer accessible and is arguably not retail. - Mr. Dean stated that if only the ground-floor retail area were considered, without the upper floor, the project would comply with the required parking. In his opinion, the upstairs inventory and employee lounge do not independently generate additional parking demand. - Mr. Dean explained that under the ordinance there is a waiver for the first 1,000 square feet, followed by a requirement of one parking space per 300 square feet. Based on that calculation, the requirement would be 57 spaces for the entire approximately 18,000- square-foot building, conservatively assuming that the entire upper floor is retail. - Mr. Dean stated that the fundamental question was whether the plan provided sufficient parking. Based on the walkability of the neighborhood, the location, and the fact that the second floor was included to minimize the footprint and maximize parking, he said that, in his professional opinion as a traffic engineer, he was confident that the project would provide sufficient parking for the neighborhood. - Mr. Dean stated that he did not believe the applicant would make this level of investment in cleaning up the site if the project would not provide adequate parking for its customers. - Mr. Dean noted that Main Street provides on-street parallel parking, including a number of spaces across the project frontage, as well as parking along Irwin. He emphasized that these spaces would be available but would not be exclusively available to the site. - Mr. Dean stated that, in his opinion, for the downtown setting, the project has an appropriate off-street parking supply and, in combination with the surrounding neighborhood, there is sufficient parking for the proposed use. - Ms. Wolfe asked Mr. Dean to discuss pedestrian safety and the potential options for addressing pedestrian concerns, including the constraints associated with those options. - Mr. Dean stated
ed use. - Ms. Wolfe asked Mr. Dean to discuss pedestrian safety and the potential options for addressing pedestrian concerns, including the constraints associated with those options. - Mr. Dean stated that they had spent considerable time reviewing the access scheme and attempting to devise the safest arrangement for pedestrians. - Mr. Dean explained that having separated ingress and egress driveways was safer than the current configuration, which had existed for approximately 30 years or more. - Mr. Dean explained the proposed apron design. He stated that, unlike the large curved radii at Irwin or Prospect, the proposed design uses an apron where the sidewalk elevation remains fixed. - Mr. Dean stated that the apron design gives priority to pedestrian movements, with vehicles becoming subordinate because they must travel up a small ramp when entering or leaving the site. - Mr. Dean explained that pedestrians continuing toward Irwin would encounter handicap ramps and detectable warning pads, allowing individuals to continue south across Irwin or north across Prospect. - Mr. Dean noted that Irwin and Prospect do not currently have painted crosswalks across Main Street, and stated that this condition is endemic to the site and exists irrespective of the current application. - Mr. Dean stated that if the Town Engineer believed that striped crosswalks would be an appropriate mitigation for increased pedestrian and vehicular traffic, and if the County concurred, the applicant would be willing to install striped crosswalks wherever they were considered warranted or preferred.
File revisions (1)
- Oct 7, 2026
89b5155dfd6e370,634 bytes