Supporting Documentation · Oct 7, 2026
8 12 26 WO PB Draft Minutes
89b5155dfd6e8da1e2d6b434b7e2576700ca3fd8942c85eafcf06f348f3f3105Indexed text · page 27
Show all pages27 ○ Mr. Dean stated that it was a reasonable suggestion to ensure that the truck could get in and out and testified that deliveries would be confined to the hours when parking was prohibited. - Mr. Valesi noted that, if the bump-out were constructed with a physical curb line, the drainage structures shown on the survey would have to be considered by the site plan engineer, including the possibility of relocating structures. Mr. Dean agreed and stated that the inlets would need to be addressed if they were impacted by the bump-out design. - Mr. Valesi asked for a sight distance triangle showing a vehicle leaving the parking lot and turning either left or right, in addition to the sight distance triangle already shown for the loading space. Mr. Dean agreed to provide the additional sight distance information and stated that the situation was no different from what exists today, but that it would be placed on a plan so it would be evidenced. PRESENTATION - Mr. Jorge Mastropietro entered on the record and confirmed that he was still under oath from the prior hearing. He testified to the following: - Mr. Mastropietro addressed a question regarding rain gutters and explained that the construction documents had not yet been started because the applicant would not begin that phase until approval was obtained. - Mr. Mastropietro testified that the building design contemplated hiding the rain gutters so that they would not be visible from Main Street. He showed an illustrative image, Exhibit A4, of a building where the gutters are concealed. - Mr. Mastropietro stated that the other roof drainage would be within the roof and ceiling cavity so that nothing would be exterior. ○ He explained that the intent was to design a beautiful building without visible gutter downspouts or similar exterior elements. - Mr. Mastropietro discussed the proposed lighting and stated that the applicant was considering LED strip lights running around the building, including along the other side. - Regarding landscaping, Mr. Mastropietro stated that rain gardens were being considered and that the civil plans identify low planting for the exit sight triangle where vehicles leave the parking lot, so that visibility is maintained. - Mr. Mastropietro stated that the information concerning the proposed trees is contained in the civil and landscaping plans. - Mr. Mastropietro stated that the bench
so that visibility is maintained. - Mr. Mastropietro stated that the information concerning the proposed trees is contained in the civil and landscaping plans. - Mr. Mastropietro stated that the bench had not been discussed previously, but following the last meeting, the applicant had considered placing it either in the front area or another indicated area. ○ He stated that the applicant was open to suggestions from the Board or community regarding its placement. - Mr. Mastropietro stated that, although he is not a traffic engineer, he is an advocate for pedestrian safety. He testified that he lives in the neighboring town of Millburn, is part of the pedestrian safety committee and planning board, and considers pedestrian safety very important. - Mr. Mastropietro explained that the applicant was considering measures within the parking lot to slow vehicles down, including a patterned surface in areas where vehicles drive. - He also discussed changing the surface of the sidewalk near the parking lot entrance and exit, including painting or otherwise changing the sidewalk surface to identify the pedestrian area.
File revisions (1)
- Oct 7, 2026
89b5155dfd6e370,634 bytes