32 - Ms. Keller stated that the site would use modern lighting fixtures, that the fixtures would be pointed downward, and that the purpose of the lighting was safety and illumination of the parking area, not to disturb neighboring properties. She stated that the goal was to keep the lighting on the site and provide efficient lighting levels. - Ms. Keller addressed the CBD design standards, noting that they are listed as guidelines in the ordinance. She stated that the applicant wanted to address them, particularly the use of certain building materials, including metal and zinc panels. - Ms. Keller stated that “context is everything” and reiterated the architect’s testimony that the building had been designed as a cohesive whole. She described the metal panels as a tasteful use of the material rather than an inexpensive or incompatible feature. - Ms. Keller stated that the purpose of the downtown design standards was not necessarily to make everything exactly cohesive, but to limit the ways in which buildings stand out in a downtown environment. She stated that this site was intended to stand out and described the design as modern without being hyper-modern. - Ms. Keller stated that the building fit into the surrounding architecture because of the way it blended into the site and that the use of metal panels on the roof and certain building materials would not be detrimental to the overall downtown goals. - Ms. Wolfe stated that the applicant was also seeking site plan approval and subdivision approval. She explained that the subdivision was unusual because the applicant was actually merging the lots, but wanted to place on the record that the approvals were required. - Ms. Keller confirmed that the application required preliminary and final major site plan approval and a technical subdivision for merging the lots. Ms. McGovern referred to it as a “reverse subdivision.” NO BOARD QUESTIONS GENERAL DISCUSSION - Mr. Valesi stated that the submission waivers requested by the applicant were incorporated into the engineering comments and offered to review them specifically for the record. - Mr. Valesi stated that the applicant had requested a waiver to provide additional contours extending off-site. Because of the wall separating the shopping center from the residential area, he stated that the additional contours should be provided. - Mr. Valesi stated that,

Page 32

ditional contours extending off-site. Because of the wall separating the shopping center from the residential area, he stated that the additional contours should be provided. - Mr. Valesi stated that, regarding the drainage calculations and drainage map, he had already spoken with Mr. Cecini, who indicated that those materials would also be provided. - Mr. Valesi initially identified those as the only three waivers from an engineering standpoint. - Chairman Bagoff noted that six waivers had been requested and that Mr. Valesi had discussed two. - Ms. Wolfe identified numbers 41 and 42 as waivers, with number 41 concerning road and paving cross-sections and number 42 concerning proposed street names. - Ms. McGovern asked him to identify the waivers that, from his perspective, were acceptable and could therefore be granted. - Mr. Valesi identified three engineering-related waivers concerning existing and proposed contour intervals based on UGS and GS datum, and contours extending at least 200 feet beyond the subject property.

File revisions (1)