Supporting Documentation · Nov 4, 2026
102226 Memo to PB
5bc5590fbfe75c941299cbfa8cd480012a40ebd81e6233738fb0ed0de39482b9Indexed text · page 2
Show all pages2 Fire Station No. 3 – Base-Bid Improvements The base bid is centered on Fire Station No. 3 and includes repairs to the damaged brick façade, repointing and resealing of masonry, cleaning and water- resistant treatment of exterior walls, repair of exterior cracks, and construction of an ADA-compliant entrance landing and ramp. Exterior site lighting is proposed at nine locations. Interior work at Station No. 3 includes new flooring and wall base; repair or replacement of ceiling tiles; replacement of interior doors and installation of code- compliant hardware; ADA shower units; low-flow plumbing fixtures; a split air- conditioning system; fire-alarm upgrades; and cleaning, repair, and painting of interior walls. The base bid also includes replacement windows with double-pane, low-emissivity glass and insulated frames; replacement of exterior personnel doors, frames, and hardware; cleaning, repair, and repainting of lintels and sills; and removal of existing window or wall-mounted mechanical units and their supports. Fire Station No. 3 – Alternate Improvements Two alternate scopes are proposed at Station No. 3. The first would improve garage ventilation through a new roof-mounted make- up air unit, associated horizontal and vertical ductwork and dampers, a new roof exhaust fan, structural supports, an extended gas line and roof supports, related masonry cutting and patching, roof screening, and relocation of furnishings as necessary for installation. The second would replace the existing gas-fired clothes dryer with a new electric dryer, adapt and patch the existing vent opening, and provide the required electrical wiring and circuit breaker. Fire Station No. 1 – Alternate Improvements The work at Fire Station No. 1 is organized as five alternate scopes. The first would remove and replace oil separator, clear the existing plumbing lines, dispose of contaminated water in accordance with approved New Jersey Department of Environmental Protection methods, and install a new separator. The second would upgrade the existing HVAC split system by adding interior cassettes and rooftop equipment, new refrigerant lines and covers, compliant recovery and replacement of refrigerant, and the electrical panel and wiring needed to support the upgraded system.
File revisions (1)
- Oct 30, 2026
5bc5590fbfe7118,802 bytes