Supporting Documentation · Nov 4, 2026
102226 Memo to PB
5bc5590fbfe75c941299cbfa8cd480012a40ebd81e6233738fb0ed0de39482b9Indexed text · page 3
Show all pages3 The third alternate would install LED exterior lighting at approximately twenty locations serving the parking area, access lane, front entrance, and garage- door areas, with dusk-to-dawn controls, and would modify the shower by installing a collapsible dam at the shower sill and relocating the existing controls. The fourth would improve garage ventilation through a new rooftop make-up air unit, four roof-mounted inlet hoods, ductwork to the garage floor area, a roof- mounted exhaust fan, and associated electrical work. The fifth would address the existing flooring by evaluating the condition of vinyl asbestos tile beneath the rubber flooring, using a licensed asbestos-abatement contractor if required, removing the existing rubber tile and base, and installing new black vinyl composition tile and base. Project Structure and Public Benefits The Township structured the project with Fire Station No. 3 improvements in the base bid and additional work at both stations as alternates so that the highest- priority work can proceed while preserving flexibility after construction pricing is received. Following receipt and review of bids, the Township will determine which alternate items can be included within available funding. Collectively, the proposed improvements are intended to correct maintenance concerns; improve accessibility; provide more reliable ventilation, cooling, fire-alarm, plumbing, and electrical systems; improve exterior illumination and working conditions; increase energy efficiency; and preserve the operational capacity of these essential public-safety facilities. Conclusion The proposed renovations are necessary to correct building conditions, replace systems, improve accessibility and code compliance, and ensure that Fire Station No. 1 and Fire Station No. 3 can continue to support safe and effective emergency- response operations. Addressing these deficiencies now will extend the useful life of both facilities. Because the work will remain within the existing building footprints, preserve the current municipal use, and be phased to maintain emergency services throughout construction, the improvements constitute a prudent and essential investment in the Township’s public-safety infrastructure. Sincerely, Mark J. Semeraro Mark J. Semeraro, Esq.
File revisions (1)
- Oct 30, 2026
5bc5590fbfe7118,802 bytes