Supporting Documentation · Nov 4, 2026
Fire Station 3 Base Bid and Fire Station 3 and Fire Station 1 Alternate Work
fbaf461ba70f80d52fcf93fc9eaf2e4b3d3605af372f212cc856c50e8597166dIndexed text · page 4
Show all pages4, Alternate No. 4A Scope of Work — Fire House No. 3 — Garage Exhaust Fans The work includes the installation of a new garage exhaust fan system « Install (1) new Make Up Air Unit over the lower roof * Install new horizontal and vertical ductwork with dampers from roof mounted MUA to floor in the garage area « Install (1) new Exhaust Fan over the garage roof ¢ Install new Structural support work associated with the new equipment Install new Electrical work associated with the new equipment Extend gas line to new MUA with new gas line roof supports * Cut, patch and repair existing brick wall « Install new roof screening panel for MUA Relocate existing furnishings as required to install new ductwork 5. Alternate No. 4B Scope of Work — Fire House No. 1 — Garage Exhaust Fans The work includes the installation of a new roof top Make-Up-Air (MUA) unit and exhaust fan system « Install (4) new roof mounted inlet hoods ¢ Instali new ducting from intake units to floor area inside the garage « Install (1) new roof mounted exhaust fan « Install new wiring and electrical as required for the new mechanical work 6. Alternate No. 5 Scope of Work — Fire House No. 1 — Remove Existing Rubber Floor and Replace with VCT The work includes the removal of the existing rubber floor tile and base and the installation of new Vinyl Composition Tile (VCT) floor and floor base Review existing asbestos tile (VAT) locations located under the existing rubber fioor. Provide a sample area of rubber floor tile removal over the existing VAT. Determine if VAT remains intact during the rubber floor tile removal. Contractor shall provide an Alternate price for rubber floor tile removal by a New Jersey licensed asbestos abatement contractor. « Remove existing rubber floor tiles and base « Install new VCT floor tiles and base (NOTE: Floor tile color is selected by West Orange) HERBST-MUSCIANO, LLC Architecture & Planning New Jetsey Certificata of Authorization AC 830 611 Main Street, Second Floor, Boonton, New Jersey 07005 Tel 973 538 3815 Fax 973 538 4095 www.herbsimusciano.com
File revisions (1)
- Oct 30, 2026
fbaf461ba70f171,675 bytes